Two new steel framed extensions were constructed to extend the store, creating additional sales floor space as well as providing a new entrance pod, in-store bakery, freezer area, customer toilets and staff welfare/office space.
In addition to the extension the interior of the store underwent a complete refurbishment, with a full internal strip-out including walls, floors and ceilings. New steel doors were fitted throughout and a curtain wall glazing system was also installed.
To improve the stores green credentials all new lighting in store was LED lighting, the heating and ventilation system was upgraded and new sun blinds were fitted with Climatronic controls.
Externally works including new cladding throughout, new signage and upgrades to loading bays as well as drainage work, re-surfacing and line marking to the car park.