Project overview
Princebuild was appointed by Landmarc to deliver essential structural roof strengthening works at Wretham Camp. The project focused on improving the long-term integrity and safety of existing kitchen roof structures within a live operational environment on a Ministry of Defence site.
The works involved careful coordination around a functioning kitchen, requiring phased delivery, temporary protection measures and close communication with site stakeholders to minimise disruption while maintaining full operational use of the building where possible.
Scope of works
- Full site setup including welfare, access and CDM compliance
- Removal and reinstatement of catering equipment to enable safe working
- Installation of temporary supports
- Removal of existing roof coverings
- Installation of additional rolled steel angles (RSAs) to improve structural capacity
- Associated steel packers and fixings
- Reinstatement of roof coverings to match existing
- Testing, inspection and certification of completed works
Summary
The project successfully delivered structural improvements to the kitchen roof areas, enhancing load capacity and long-term durability. The works have ensured the building is now safer, more robust, and fit for continued operational use.
The client benefits from increased confidence in the asset’s performance, reduced risk of future structural defects, and improved compliance with safety and maintenance requirements.