Overview
This landmark project, commissioned by Lakeside Centre Ltd, involved the transformation of MSU 229 and the amalgamation of 11 retail units and a section of the shopping mall into a single, unified space for a new incoming retailer..The project required meticulous planning and execution to meet the client’s vision while ensuring minimal disruption to the mall’s ongoing operations.
Scope of Works
The works comprised a wide range of activities aimed at delivering a bespoke retail space tailored to the incoming retailer’s requirements. Key elements included:
- Strip-out Works: Removal of the former shop units, reducing them to a shell-and-core state to prepare for redevelopment.
- Structural Modifications:
- Structural infill of concrete slabs following the removal of vertical access equipment.
- Installation of structural steelwork and decking to infill former atrium openings between floor levels.
- Installation of structural steelwork to support the removal of concrete slabs and the formation of service risers.
- Landlord Corridors: Formation of new corridors, including the installation of necessary services to ensure functionality.
- Utility Upgrades: Enabling works for the installation of an 800kVA substation to serve the incoming retailer.
- Fire Safety: Installation of 2-hour fire encasement to all structural steelwork to meet stringent safety standards.
- Service Diversions: Diversion of existing landlord services to accommodate the new retail space with minimal disruption.
- Drainage Systems: Installation of new above- and below-ground drainage systems to comply with retailer-specific needs.
Additionally, the relocation of one of the existing retailers posed a unique challenge. To facilitate this, a temporary store was constructed, enabling the retailer to continue operations without any downtime while their new store was built and fitted out.
Summary
This comprehensive redevelopment project successfully amalgamated 11 retail units, existing landlord corridors, and part of the shopping mall into a cohesive retail space. Extensive out-of-hours surveys and careful service diversions ensured that existing operations continued smoothly throughout the construction period. By working closely with the affected retailer, a temporary store solution was implemented to prevent any loss of trade, showcasing the project team’s commitment to client satisfaction.