Sectors

Services

Strip-out, sub-division and provision of Landlord areas of the Former John Lewis Store

Value: £16,500,000.00

Duration: 62 weeks

Client: Global Mutal

Completed: October 2024

View Case Study

Waitrose & Partners, Daventry Store Renovation

Value: £55,000

Duration: 2 weeks

Client: JLP Waitrose & Partners

Completed: July 2024

View Case Study

Primark Shell Works

Value: £10,500,000

Duration: 48 weeks

Client: Hermes CMK General Partner

Completed: November 2018

View Case Study

Unit 16 and Unit 15 Refurbishment and Fit-Out – The Glades, Bromley

Value: £600,000

Duration: 11 weeks

Client: Workman LLP

Completed: July 2024

View Case Study

The Pilfolds, Horsham – Fire damage refurbishment

Value: £500,000

Duration: 24 weeks

Client: Brawdia/Private

Completed: July 2024

View Case Study

Supermarket Refurbishment

Value: £2.2 million

Duration: 10 weeks

Client: Waitrose

Completed: June 2024

View Case Study

Police Station Upgrades

Value: Undisclosed

Duration: 6 weeks

Client: Undisclosed

Completed: December 2023

View Case Study

Newborough Village Hall Extension

Value: £140,000

Duration: 22 weeks

Client: Newborough Village Hall

Completed: May 2024

View Case Study

Peterborough Museum LED Upgrade

Value: £65,000

Duration: 3 weeks

Client: Peterborough City Council

Completed: June 2024

View Case Study

Waitrose Droitwich-LFL Refrigeration

Value: £1.7 million

Duration: 8 weeks

Client: Waitrose

Completed: June 2024

View Case Study

Changing Places, Queensgate Shopping Centre, Peterborough

Value: £118,000

Duration: 5 weeks

Client: Queensgate Shopping Centre, Peterborough (Workman instructed)

Completed: June 2024

View Case Study

Welfare Facilities Refurbishment

Value: £75,000

Duration: 5 weeks

Client: Coveris

Completed: May 2024

View Case Study

Commercial Strip Out – Victoria Centre, Nottingham

Value: £2 million

Duration: 22 weeks

Client: Workman-Global London

Completed: January 2024

View Case Study

En-Suite Renovation

Value: £17,000

Duration: 2 weeks

Client: PLG

Completed: March 2024

View Case Study

Espresso – Costa Oswestry

Value: £1.2 million

Duration: 20 weeks

Client: WM Morrisons Supermarkets Limited

Completed: October 2023

View Case Study

Supermarket Refurbishment

Value: £2.3 million

Duration: 7 weeks

Client: Waitrose

Completed: October 2023

View Case Study

LED Project

Value: £580,000

Duration: 6 weeks

Client: Amey

Completed: September 2023

View Case Study

LED Project – BMAT Trust

Value: £580,000

Duration: 6 weeks

Client: BMAT Trust

Completed: September 2023

View Case Study

Digital Signage Installation

Value: £100,000

Duration: 4 weeks

Client: The Crown Estate

Completed: September 2023

View Case Study

Palace Gardens Shopping Centre Mall and WC Refurbishment

Value: £1.7 million

Duration: 12 weeks

Client: DWS Asset Management (Employers Agent: Ridge and Partners LLP)

Completed: November 2023

View Case Study

West Tofts and Wretham Camp: Kitchen Roof Replacements

Duration: 12 weeks

Client: Landmarc Support Services

Completed: January 2024

View Case Study

Pizza Express, Basingstoke – Conservatory Install & External Refurbishment

Value: £280,000

Duration: 14 weeks

Client: Gerald Eve

Completed: December 2023

View Case Study

Wendy’s Fit Out

Value: £280,000

Duration: 7 weeks

Client: Blank Table

Completed: October 2023

View Case Study

Morrisons Fresh Look 2023

Value: £5.5 million (10 stores) - Range per store £290k - £780k

Duration: Typically 4 - 6 weeks per store

Client: Morrisons

Completed: September 2023

View Case Study

Waitrose – Supermarket Refurbishment

Value: £2.2 million

Duration: 8 weeks

Client: Waitrose

Completed: September 2023

View Case Study

H&M Enabling Works Project, Midsummer Arcade

Value: £2,800,000

Duration: 14 weeks

Client: Hermes c/o Workman LLP

Completed: September 2022

View Case Study

Costa Drive Thru Shell build Bromsgrove and Walsall

Value: £1,780,000

Duration: 16 weeks per site

Client: Morrisons

Completed: November 2022

View Case Study

WMS Leighton Buzzard store refresh

Value: £500,000

Duration: 4 weeks

Client: Morrisons

Completed: April 2023

View Case Study

Regent Gate internal & external office refurbishment

Value: £470,000

Duration: 16 weeks

Client: Graham Sibbald & Kenningtons

Completed: December 2022

View Case Study

Complete office refurbishment at Mortimer House, Clapham

Value: £545,000

Duration: 14 weeks

Client: Columbia Threadneedle Investments

Completed: January 2022

View Case Study

Refurbishment of floors 5 and 8 of Northumberland House, High Holborn

Value: £330,000

Completed: March 2023

View Case Study

External refurbishment of industrial units at The Exchange, Ipswich

Duration: 31 weeks

Client: Workman LLP

Completed: February 2023

View Case Study

Amalgamation of 3 units at The Glades

Duration: 14 weeks

Client: Alaska UK

Completed: March 2023

View Case Study

Nike up size project at the London Designer Outlet

Value: £700,000

Duration: 14 weeks

Client: Quintain

Completed: February 2022

View Case Study

Refrigeration renovation and store update, Diss

Value: £2,600,000

Duration: 27 weeks inc. Christmas break

Client: Morrisons

Completed: February 2023

View Case Study

Morrisons Chelmsford new store

Value: £2,000,000

Duration: 15 weeks

Client: Morrisons

Completed: February 2023

Claremont Parkway Care Home, Kettering, Care Home refurbishment

Duration: 25 weeks

Client: Barchester Healthcare Ltd

Completed: September 2022

The Cedars, Bourne, Care Home refurbishment

Duration: 20 weeks

Client: Barchester Healthcare Ltd

Completed: May 2022

Flooring replacement at Peterborough Regional Pool

Value: £15,000

Duration: 2 weeks

Client: Peterborough Limited

Completed: February 2022

View Case Study

Office refurbishment, 32 Ludgate Hill, London

Value: £120,000

Duration: 10 weeks

Completed: November 2021

Cat A office refurbishment, Croxley Park, Watford

Value: £240,000

Duration: 12 weeks

Completed: June 2021

Office refurbishment, 95 Aldwych Street, London

Value: £130,000

Duration: 11 weeks

Client: Hartnell Taylor Cook

Completed: May 2021

Waitrose refurbishment Alcester

Value: £1,500,000

Duration: 8 weeks

Client: Waitrose/ John Lewis Partnership

Completed: June 2021

Design, build and install of roof conservatory at St Pancras Hospital

Value: £65,000

Duration: 6 weeks

Client: Camden & Islington NHS Foundation Trust

Completed: May 2021

View Case Study

Phase 2 warehouse refurbishment works at Jewson Ruislip

Value: £280,000

Duration: 12 weeks

Client: Saint-Gobain Building Distribution

Completed: March 2021

Covid-19 vaccinations unit, St Leonards Hospital

Value: £40,000

Duration: 8 days

Client: NHS Property Services Ltd

Completed: December 2020

External refurbishment St John Street, Clerkenwell

Value: £200,000

Duration: 12 weeks

Client: Daniel Watney

Completed: December 2020

Refurbishment to create Social Prescribing Hub

Value: £135,000

Duration: 5 weeks

Client: NHS Property Services Ltd

Completed: December 2020

Fresh Look upgrade Retford store

Value: £2,800,000

Duration: 18 weeks

Client: Morrisons

Completed: November 2020

View Case Study

Public realm enhancement project – Notting Dale Village Campus

Value: £1,200,000

Duration: 20 weeks

Client: Gerald Eve LLP

Completed: November 2020

View Case Study

Flooring replacement following flood damage

Value: £40,000

Duration: 3 weeks

Client: Peterborough United Football Club

Completed: October 2020

Former Waitrose store conversion, Oadby

Value: £1,600,000

Duration: 18 weeks

Client: Lidl UK

Completed: September 2020

Phase 2, entrance improvement project at Grand Central Train Station Birmingham

Client: Workman LLP

Completed: September 2020

Replacement tenant and advertising signage, Grafton Centre, Cambridge

Client: Bidwells

Completed: September 2020

New store, Southend-on-Sea

Value: £900,000

Duration: 13 weeks

Client: Lidl UK

Completed: August 2020

View Case Study

Fire damage repairs toThe Progression Centre, Hemel Hempstead

Value: £1,100,000

Duration: 31 weeks

Client: Fire damage repairs toThe Progression Centre, Hemel Hempstead

Completed: September 2020

Insurance repairs and remedial works, Thurleigh

Value: £65,000

Duration: 10 weeks

Client: Insurance repairs and remedial works, Thurleigh

Completed: September 2020

Former Co-op store conversion, Glenfield

Value: £4,100,000

Duration: 22 weeks

Client: Former Co-op store conversion, Glenfield

Completed: August 2020

Cafe refurbishment – Retford

Client: Morrisons - Cafe refurbishment - Retford

Completed: August 2020

Office refurbishment following flood damage

Duration: 12 weeks

Client: Unite the Union

Completed: August 2020

Covid-19 workplace protection screens

Client: NHS Property Services Ltd

Completed: May 2020

Conversion of former Co-op store in Stirchley

Client: Morrisons

Completed: July 2020

Covid-19 workplace protection screens

Duration: 1 day

Client: Buckles Solicitors LLP

Completed: July 2020

Category A office refurbishment, London

Value: £120,000

Duration: 12 week

Client: Zurich Assurance Ltd

Completed: June 2020

St Pancras Hospital refurbishment

Value: £40,000

Duration: 3 weeks

Client: Camden and Islington NHS Trust

Completed: March 2020

Morrisons Bradwell – Store conversion

Duration: 7 weeks

Client: Morrisons

Completed: April 2020

Morrisons Worksop – Freshlook launch

Duration: 8 weeks

Client: Morrisons

Completed: March 2020

Construction of new warehouse and refurbishment to existing building at Jewson Ruislip

Value: £870,000

Duration: 20 weeks

Client: Saint-Gobain Building Distribution

Completed: July 2020

View Case Study

Office extension and refurbishment

Value: £111,000

Duration: 13 weeks

Client: Colas UK

Completed: October 2020

Façade refurbishment on Oxford Street, London

Value: £60,000

Duration: 5 weeks

Client: Workman LLP

Completed: October 2020

Refurbishment of industrial unit, Hornsey

Value: £260,000

Duration: 10 weeks

Client: Workman LLP

Completed: June 2020

View Case Study

Office refurbishment

Value: £150,000

Duration: 6 weeks

Client: Vaages Surveying/Dencora

Completed: January 2020

View Case Study

Phase 5 sprinkler upgrades at centre:mk – Eagle & Field Walk

Value: £3,180,000

Duration: 48 weeks

Client: Hermes CMK General Partner Ltd

Completed: September 2019

View Case Study

Hickathrift House Care Home refurbishment

Value: £300,000

Duration: 15 weeks

Client: Barchester Healthcare Ltd

Completed: September 2019

View Case Study

Wood Grange Care Home refurbishment

Value: £280,000

Duration: 14 weeks

Client: Barchester Healthcare Ltd

Completed: August 2019

View Case Study

Refurbishment of Rushden store

Value: £700,000

Duration: 10 weeks

Client: Lidl UK

Completed: August 2019

New store creation in Canning Town

Value: £3,500,000

Duration: 18.5 weeks

Client: Morrisons

Completed: October 2019

View Case Study

Fresh Look upgrade and reconfiguration at Letchworth store

Value: £2,500,000

Duration: 19 weeks

Client: Morrisons

Completed: September 2019

Fit out of 4 storey office block, Hainault

Value: £525,000

Duration: 14 weeks

Client: Keningtons LLP

Completed: July 2019

View Case Study

Longueville Court Care Home refurbishment

Value: £430,000

Duration: 17 weeks

Client: Barchester Healthcare Ltd

Completed: May 2019

View Case Study

WMS Hoddesdon Fresh Look

Value: £1,100,000

Duration: 6 weeks

Client: Morrisons

Completed: April 2019

View Case Study

Internal and external refurbishment of production unit

Value: £325,000

Duration: 8 weeks

Client: Tuffin Ferraby Taylor LLP

Completed: April 2019

View Case Study

Retail unit conversion at intu Uxbridge

Value: £2,800,000

Duration: 36 weeks

Client: intu

Completed: January 2019

View Case Study

Construction of aviaries at East Winch Wildlife Centre

Duration: 14 weeks

Client: RSPCA

Completed: November 2018

View Case Study

Conversion works at Daleham Gardens Health Centre

Value: £270,000

Duration: 11 weeks

Client: Camden and Islington NHS trust

Completed: March 2019

Fresh Look upgrade to Wood Green store

Value: £3,750,000

Duration: 20 weeks

Client: Morrisons

Completed: November 2018

View Case Study

Rose Lodge Care Home refurbishment

Value: £250,000

Duration: 14 weeks

Client: Barchester Healthcare Ltd

Completed: January 2019

View Case Study
Barchester dining room

Extension and Fresh Look upgrade to Sidcup store

Value: £3,800,000

Duration: 22 weeks

Client: Morrisons

Completed: November 2018

View Case Study
Morrisons glass entrance

Musicians’ Union internal and external refurbishment

Value: £293,000

Duration: 13 weeks

Client: Musicians' Union

Completed: October 2018

Musicians Union

Morrisons Grantham Fresh Look

Value: £1,200,000

Duration: 9 weeks

Client: Morrisons

Completed: October 2018

View Case Study
Morrisons Grantham fruit and veg

Extension and Fresh Look Refurbishment, Welwyn Garden City

Value: £2,646,000

Duration: 20 weeks

Client: Morrisons

Completed: November 2017

View Case Study
Morrisons WGC

Home Shopping Pods and Canopies

Value: £1,130,000

Duration: 15 weeks

Client: Morrisons

Completed: November 2017

View Case Study

Refurbishment of Chater Lodge Care Home, Stamford

Value: £220,000

Duration: 12 weeks

Client: Barchester Healthcare Limited

Completed: August 2018

Refurbishment of Industrial Unit, Unit E Chiltern Park

Value: £1,440,000

Duration: 20 weeks

Client: ML Accessories Ltd

Completed: April 2018

View Case Study

Werrington Lodge Care Home refurbishment

Value: £240,000

Duration: 12 weeks

Client: Barchester Healthcare Ltd

Completed: March 2018

View Case Study
Werrington Lodge Care Home refurbishment

Phase 3 sprinkler upgrades at centre:mk

Value: £1,200,000

Duration: 20 weeks

Client: Hermes Plc

Completed: April 2018

View Case Study

Internal and external refurbishment works

Value: £330,000

Duration: 8 weeks

Client: Greencore Group

Completed: March 2018

View Case Study
Greencore Warehouse

Creation of two semi-detached bungalows

Duration: 6 months

Client: Kings Lynn West Norfolk Council

Completed: January 2018

View Case Study
new builds

95 Aldwych, London, roof replacement and external decoration

Value: £230,000

Duration: 16 weeks

Client: Hartnell Taylor Cook LLP

Completed: October 2017

Aldwych roof repairs

Strip out of former BHS unit at centre:mk

Value: £1,100,000

Duration: 14 weeks

Client: Workman LLP

Completed: September 2017

BHS strip out

Collingtree Park Care Home refurbishment

Value: £210,000

Duration: 12 weeks

Client: Barchester Healthcare Ltd

Completed: August 2017

Barchester

Deer Walk Guest Services Lounge centre:mk

Value: £5,800,000

Duration: 44 weeks

Client: Hermes CMK General Partner Ltd

Completed: June 2017

View Case Study

Warehouse refurbishment to create new CTD Centre, Lincoln

Value: £160,000

Duration: 9 weeks

Client: Saint Gobain

Completed: July 2017

CTD Lincoln

Communal areas refurbishment, Charles Street London

Value: £422,000

Duration: 12 weeks

Client: Keningtons LLP

Completed: March 2017

Charles street London interior

Creation of Pathology Lab, Charing Cross Hospital

Value: £170,000

Duration: 5 weeks

Client: Imperial College Healthcare NHS Trust

Completed: June 2017

Charing Cross Hospital

Cassio Metro Leisure Centre, fire damage repairs

Value: £830,000

Duration: 36 weeks

Client: Arun Associates

Completed: May 2017

Caasio Metro Centre pool

Development of Manor Field Residential Facility

Value: £325,000

Duration: 12 weeks

Client: The Priory Group (Craegmoor)

Completed: August 2016

Manor Field Residentail facility

Farmfield & Thornford Park Anti-Ligature Works

Value: £860,000

Duration: Completed over a 3 year period

Client: The Priory Group (Priory Healthcare)

Completed: September 2016

Priory Thornford park

Refurbishment of The Oaks Care Home

Value: £425,000

Duration: 36 weeks

Client: The Priory Group (Amore Care)

Completed: March 2015

The Oaks Care Home

Refurbishment of Belhaven Care Home

Value: £220,000

Duration: 8 weeks

Client: The Priory Group

Completed: July 2015

Belhaven Care home

Strip out and landlord enabling works, Queensgate Shopping Centre

Value: £400,000

Duration: 11 weeks

Client: Redevco

Completed: January 2017

Enabling works at Queensgate shopping centre

Priority Plumbing Refurbishment, New Southgate, London

Value: £110,000

Duration: 6 weeks

Client: Saint Gobain

Completed: February 2017

Priority Plumbing New Southgate

Extension and Alterations to Broomwood Surgery

Value: £1,000,000

Duration: 35 weeks

Client: Drs Bamberger & Lasrado

Completed: December 2016

External of Broomwood surgery

Reinstatement of domestic dwelling after fire damage

Value: £65,000

Duration: 20 weeks

Client: Quantum Survey Management

Completed: July 2016

View Case Study
modern fitted kitchen

Fresh Look reformat, Morrisons Maldon

Value: £400,000

Duration: 4 weeks

Client: Wm Morrison Supermarkets

Completed: October 2016

Morrisons Maldon

Critical Refrigeration, Morrisons Leighton Buzzard

Value: £1,100,000

Duration: 12 weeks

Client: Wm Morrison Supermarkets

Completed: August 2016

Morrisons Leighton Buzzard

Office Refurbishment, Sol House, Northampton

Value: £1,000,000

Duration: 16 weeks

Client: Workman LLP / Simply Business

Completed: October 2016

Office Refurbishment Sol House

Fresh Look reformat, Morrisons Cambourne

Value: £400,000

Duration: 5 weeks

Client: Wm Morrison Supermarkets

Completed: September 2016

Morrisons Cambourne

Extension of Primrose unit oncology ward

Value: £440,000

Duration: 16 weeks

Client: Bedford Hospital NHS Trust

Completed: September 2016

View Case Study
Primrose oncology unit

Temple Lodge external upgrades

Value: £130,000

Duration: 12 weeks

Client: Abbey Commercial Ltd

Completed: September 2016

Temple Lodge external view

Structural alterations and landlord enabling works

Value: £90,000

Duration: 6 weeks

Client: INTU Chapelfield Shopping Centre

Completed: September 2016

INTU Chapelfield

Internal alterations to convert single dwelling into two dwellings

Value: £82,000

Duration: 12 weeks

Client: Longhurst and Havelock Homes

Completed: September 2016

newly fitted kitchen

Fresh Look reformat, Morrisons Eastwood

Value: £660,000

Duration: 5 weeks

Client: Wm Morrison Supermarkets

Completed: September 2016

Morrisons Eastwood

Essential refrigeration works & Fresh Look, Morrisons Northampton

Value: £1,300,000

Duration: 10 weeks

Client: Wm Morrison Supermarkets

Completed: September 2016

Morrisons Northampton

Conversion of flats into classrooms

Value: £42,000

Duration: 5 weeks

Client: The Priory Group

Completed: September 2016

classroom conversion

Conversion of domestic dwelling to 6 bed care home

Value: £215,000

Duration: 12 weeks

Client: The Priory Group

Completed: August 2016

Priory Group Manorfield Farm

Undercroft extension of retail unit at INTU Chapelfield Shopping Centre Norwich for Cafe Nero

Value: £150,000

Duration: 16 weeks

Client: INTU Properties PLC

Completed: August 2016

INTU cafe Nero Extension

Westpoint car park extension

Value: £1,840,000

Duration: 16 weeks

Client: SPCP GROUP III LOPD 14

Completed: July 2016

West Point car park block paved area

Fresh Look Store Re-fit Morrisons Felixstowe

Value: £400,000

Duration: 4 weeks

Client: Wm Morrison Supermarkets

Completed: June 2016

Morrisons Felixtowe Fresh Look

Eight Instore Cafe Re-fits

Value: £400,000

Duration: 8 weeks

Client: Wm Morrison Supermarkets

Completed: May 2016

Fresh Look at Morrisons Cafe

Refurbishment of Jim Gillespie House Care Home

Value: £180,000

Duration: 14 weeks

Client: Abbeyfield Care

Completed: May 2016

Redecoration of corridors

Office Refurbishment Phase 2, Medina House, Milton Keynes

Value: £530,000

Duration: 12 weeks

Client: Dencora (2000) Ltd

Completed: May 2016

Medina House Milton Keynes

West Oak Care Home Refurbishment

Value: £180,000

Duration: 10 weeks

Client: Barchester Healthcare

Completed: May 2016

West Oak Care Home Refurbishment for Barchester

Additional security measures at Queensgate Shopping Centre car parks

Value: £1,300,000

Duration: 12 months

Client: Queensgate Shopping Centre

Completed: May 2016

View Case Study
Safety measure at Queensgate car parks

Reigate Beaumont Care Home Refurbishment

Value: £160,000

Duration: 10 weeks

Client: Barchester Healthcare

Completed: May 2016

Reigate Beaumont Care Home Refurbishment

New Store Fit-out, Morrisons, Colindale

Value: £4,000,000

Duration: 14 weeks

Client: Wm Morrison Supermarkets

Completed: March 2016

View Case Study

Office Refurbishment, Medina House, Milton Keynes

Value: £600,000

Duration: 10 weeks

Client: Dencora (2000) Limited

Completed: February 2016

Medina House

Flat conversion project

Value: £160,000

Duration: 12 weeks

Client: Danshell

Completed: February 2016

Conversion of Two Flats to Living Accomodation at Thors Park for Danshell

Extension & Refurbishment of Care Home

Value: £630,000

Duration: 32 weeks

Client: Together for Mental Wellbeing

Completed: February 2016

View Case Study
Bexhill Care Home

Construction of Chinnor Community Building

Value: £1,200,000

Duration: 46 weeks

Client: Chinnor Parish Council

Completed: February 2016

Chinnor Community Pavillion

Refurbishment of Ward 7a, Lister Hospital

Value: £270,000

Duration: 8 weeks

Client: East & North Herts NHS Trust

Completed: December 2015

View Case Study
Lister Hospital

Major Alterations Work to Live Jewson Store

Value: £750,000

Duration: 21 weeks

Client: Jewson Saint-Gobain Ltd

Completed: October 2015

Jewson Hereford

Reconfiguration & Refurbishment of The Priory Hospital, Heathfield

Value: £340,000

Duration: 10 weeks

Client: The Priory Group

Completed: October 2015

Priory Hospital, Heathfield

Works in Lieu of Dilapidations at 20–22 Berkeley Square, London

Value: £40,000

Duration: 4 weeks

Client: Keningtons LLP

Completed: September 2015

20–22 Berkeley Square, London

Refurbishment of Agricultural Building

Value: £265,000

Duration: 10 weeks

Client: East of England Agricultural Society

Completed: September 2015

East of England Agricultural Society

Refurbishment and alterations to Nissan Showroom

Value: £200,000

Duration: 12 weeks

Client: Smiths Motor Group

Completed: September 2015

Smiths Motor Group Peterborough

Jack Hunt School, Life Cycle Works

Value: £327,000

Duration: 5 weeks

Client: Bouygues UK

Completed: September 2015

Jack Hunt School, Life Cycle Works

Window Replacements Bevington Primary School

Value: £350,000

Duration: 5 weeks

Client: Amey

Completed: August 2015

Bevington Primary school window replacement

Children’s Home Refurbishment, Ipswich

Value: £220,000

Duration: 8 weeks

Client: Priory Group

Completed: July 2015

Priory Group refurbishment Ipswich

900 Pavillion Drive Office Refurbishment

Value: £365,000

Duration: 26 weeks

Client: Zurich Assurance

Completed: June 2015

office refurbishment lighting

Venture Park Refurbishment of Offices and Commercial Units

Value: £420,000

Duration: 11 weeks

Client: Zurich Assurance

Completed: March 2015

Venture Park refurbishment

Internal Refurbishment of Donington Church Hall

Value: £40,000

Duration: 9 weeks

Client: Donington Church PCC

Completed: March 2015

Bedford Hospital Endoscopy Refurbishment Phase 2

Value: £400,000

Duration: 8 weeks

Client: Bedford Hospital NHS Trust

Completed: March 2015

Bedford Hospital Endoscopy

Internal Alterations and Refurbishment, Western House, Lynchwood

Value: £312,000

Duration: 12 weeks

Client: Dencora Peterborough LLP

Completed: March 2015

office refurb western house

Office Fit out at Unison Centre, Kings Cross

Value: £185,000

Duration: 8 weeks

Client: Unison

Completed: March 2015

unison signage

Office Refurbishment, Chelmsford

Value: £160,000

Duration: 6 weeks

Client: Threadneedle UK Property Trust

Completed: February 2015

Threadneedle UK Property Trust Chelmsford

Extension for Giles Brook School, Milton Keynes

Value: £195,000

Duration: 18 weeks

Client: Giles Brook School

Completed: January 2015

Giles Brook nursery extension

Morrison’s Critical Refrigeration Works, Peckham

Value: £1,100,000

Duration: 14 weeks

Client: WM Morrison Supermarkets PLC

Completed: December 2014

Morrisons Peckham

Refurbishment of Fire Damaged Industrial Units

Value: £825,000

Duration: 24 weeks

Client: Belljoy Limited

Completed: December 2014

fire damage repair in Corby

Enstone Parish Hall Internal Fit Out

Value: £100,000

Duration: 6 weeks

Client: Enstone Parish Council

Completed: November 2014

Enstone Parish Hall external

Corporate Identity Refresh to Vauxhall Showroom

Value: £154,000

Duration: 15 weeks

Client: Smiths Motor Group

Completed: October 2014

Corporate Identity Refresh to Vauxhall Showroom

Faringdon Lodges Refurbishment

Value: £350,000

Duration: 42 weeks

Client: The National Trust

Completed: September 2014

Faringdon Lodges The National Trust

Sue Ryder Hospice

Value: £950,000

Duration: 26 Weeks

Client: Sue Ryder

Completed: May 2014

View Case Study
sue ryder hospice

Barratt Industrial Park Refurbishment

Value: £345,000

Duration: 20 weeks

Client: Workman LLP

Completed: May 2014

Barratt Industrial Park

Bedford Hospital NHS Trust

Value: £500,000

Duration: 26 Weeks

Client: Bedford Hospital NHS Trust

Completed: February 2014

View Case Study
bedford hospital reception

Refurbishment of Museum and Gallery

Value: £140,000

Duration: 12 weeks

Client: Peterborough City Council

Completed: November 2013

Peterborough City Council Museum and Gallery

Newlands Shopping Centre Lighting & Ceiling Refit

Value: £400,000

Duration: 16 weeks

Client: Ellandi

Completed: November 2013

shopping centre lighting

Industrial Unit Refurbishment, Leamington Spa

Value: £375,000

Duration: 12 weeks

Client: Transco

Completed: October 2013

factory internal

Refurbishment and Anti-Ligature Works, Chadwick Lodge

Value: £358,000

Duration: 22 weeks

Client: The Priory Group

Completed: September 2013

Chadwick Lodge The Priory Group

Extension to Accommodate Fitness Suite

Value: £380,000

Duration: 16 weeks

Client: The Kings (Cathedral) School, Peterborough

Completed: August 2013

The King’s (Cathedral) School, Peterborough

New Hyundai Retail Outlet for Smith Motor Group

Value: £560,000

Duration: 32 weeks

Client: Smiths Motor Group

Completed: August 2013

New Hyundai Retail Outlet for Smiths Motors

Rebranding of Oxfam Store, Bury St Edmunds

Value: £80,000

Duration: 9 weeks

Client: Oxfam Property Services

Completed: August 2013

Oxfam Store, Bury St Edmunds

Refurbishment and New Build, International Timber

Value: £3,000,000

Duration: 16 weeks

Client: International Timber

Completed: June 2013

International Timber

Remodelling of Offices, W M Morrison, Swan Valley

Value: £470,000

Duration: 16 weeks

Client: W M Morrison

Completed: May 2013

Swan Valley

Extension to Create Two New Classrooms

Value: £151,000

Duration: 14 weeks

Client: Barnack CE Primary School

Completed: March 2013

Barnack CE Primary School

Refurbishment of Office Complex

Value: £81,500

Duration: 5 weeks

Client: UNITE Union

Completed: November 2012

UNITE union office refurbishment

Frys Court, OCHA

Value: £420,000

Duration: 34 Weeks

Client: Oxford Citizens Housing Association

Completed: August 2012

View Case Study
frys court external

Refurbishment of Residential Property

Value: £115,000

Duration: 30 weeks

Client: Merton College

Completed: August 2012

Rothwell house exterior

Longthorpe Hall Hospice Refurbishment

Value: £74,000

Duration: 15 weeks

Client: Sue Ryder Care

Completed: July 2012

Longthorpe Hall Hospice

Sheltered Housing Refurbishment & Construction

Value: £420,000

Duration: 20 weeks

Client: Catalyst Housing Ltd

Completed: July 2012

Catalyst Housing Ltd Refurbishment

Void Cottage Refurbishment

Value: £48,000

Duration: 11 weeks

Client: The National Trust

Completed: June 2011

Void Cottage Refurbishment The National Trust

Conversion of Old Retort House, Cliveden House

Value: £35,000

Duration: 6 weeks

Client: The National Trust

Completed: May 2011

Conversion of Old Retort House, Cliveden House

Craegmoor Group Refurbishment

Value: £690,000

Duration: 20 Weeks

Client: Craegmoor Group

Completed: February 2011

View Case Study
Craegmoor group refurbishment
Read our Privacy Policy and remember that you can withdraw your consent at any time.
Skip to content