Sectors
Services
Unit 200, Lakeside Centre Ltd, Landlord Enabling Works
Value: £2.1 million
Duration: 16 weeks
Completed: October 2024
View Case StudyBury St. Edmunds Ambulance Hub Fit-Out
Value: £640,000
Duration: 12 weeks
Client: East of England Ambulance Service. Contract Administrator - Vaages Surveying Limited
Completed: November 2024
View Case StudyBoots World of Hearing—Ealing Broadway
Value: £350,000
Duration: 4 weeks
Client: Boots World of Hearing
Completed: November 2024
View Case StudyKings Thorpe Village Primary School
Value: £77,856.92
Duration: 5 weeks
Client: Amey
Completed: August 2024
View Case StudyWaitrose Biggin Hill Store Renovation and Upgrades
Value: £2,000,000
Duration: 8 weeks
Client: JLP Waitrose & Partners
Completed: September 2024
View Case StudyKingsthorpe Community College
Value: £251,348.91
Duration: 6 weeks
Client: Amey
Completed: August 2024
View Case StudyCavalry Crescent Refurbishment Project
Value: £4,900,000
Duration: 23 Months
Client: Annington Homes
Completed: July 2024
View Case StudyStrip-out, sub-division and provision of Landlord areas of the Former John Lewis Store
Value: £16,500,000.00
Duration: 62 weeks
Client: Global Mutal
Completed: October 2024
View Case StudyWaitrose & Partners, Daventry Store Renovation
Value: £55,000
Duration: 2 weeks
Client: JLP Waitrose & Partners
Completed: July 2024
View Case StudyPrimark Shell Works
Value: £10,500,000
Duration: 48 weeks
Client: Hermes CMK General Partner
Completed: November 2018
View Case StudyUnit 16 and Unit 15 Refurbishment and Fit-Out – The Glades, Bromley
Value: £600,000
Duration: 11 weeks
Client: Workman LLP
Completed: July 2024
View Case StudyThe Pilfolds, Horsham – Fire damage refurbishment
Value: £500,000
Duration: 24 weeks
Client: Brawdia/Private
Completed: July 2024
View Case StudySupermarket Refurbishment
Value: £2.2 million
Duration: 10 weeks
Client: Waitrose
Completed: June 2024
View Case StudyWaitrose Droitwich-LFL Refrigeration
Value: £1.7 million
Duration: 8 weeks
Client: Waitrose
Completed: June 2024
View Case StudyWelfare Facilities Refurbishment
Value: £75,000
Duration: 5 weeks
Client: Coveris
Completed: May 2024
View Case StudyCommercial Strip Out – Victoria Centre, Nottingham
Value: £2 million
Duration: 22 weeks
Client: Workman-Global London
Completed: January 2024
View Case StudyEn-Suite Renovation
Value: £17,000
Duration: 2 weeks
Client: PLG
Completed: March 2024
View Case StudyEspresso – Costa Oswestry
Value: £1.2 million
Duration: 20 weeks
Client: WM Morrisons Supermarkets Limited
Completed: October 2023
View Case StudySupermarket Refurbishment
Value: £2.3 million
Duration: 7 weeks
Client: Waitrose
Completed: October 2023
View Case StudyLED Project
Value: £580,000
Duration: 6 weeks
Client: Amey
Completed: September 2023
View Case StudyLED Project – BMAT Trust
Value: £580,000
Duration: 6 weeks
Client: BMAT Trust
Completed: September 2023
View Case StudyDigital Signage Installation
Value: £100,000
Duration: 4 weeks
Client: The Crown Estate
Completed: September 2023
View Case StudyPalace Gardens Shopping Centre Mall and WC Refurbishment
Value: £1.7 million
Duration: 12 weeks
Client: DWS Asset Management (Employers Agent: Ridge and Partners LLP)
Completed: November 2023
View Case StudyWest Tofts and Wretham Camp: Kitchen Roof Replacements
Duration: 12 weeks
Client: Landmarc Support Services
Completed: January 2024
View Case StudyPizza Express, Basingstoke – Conservatory Install & External Refurbishment
Value: £280,000
Duration: 14 weeks
Client: Gerald Eve
Completed: December 2023
View Case StudyWendy’s Fit Out
Value: £280,000
Duration: 7 weeks
Client: Blank Table
Completed: October 2023
View Case StudyMorrisons Fresh Look 2023
Value: £5.5 million (10 stores) - Range per store £290k - £780k
Duration: Typically 4 - 6 weeks per store
Client: Morrisons
Completed: September 2023
View Case StudyWaitrose – Supermarket Refurbishment
Value: £2.2 million
Duration: 8 weeks
Client: Waitrose
Completed: September 2023
View Case StudyH&M Enabling Works Project, Midsummer Arcade
Value: £2,800,000
Duration: 14 weeks
Client: Hermes c/o Workman LLP
Completed: September 2022
View Case StudyCosta Drive Thru Shell build Bromsgrove and Walsall
Value: £1,780,000
Duration: 16 weeks per site
Client: Morrisons
Completed: November 2022
View Case StudyWMS Leighton Buzzard store refresh
Value: £500,000
Duration: 4 weeks
Client: Morrisons
Completed: April 2023
View Case StudyRegent Gate internal & external office refurbishment
Value: £470,000
Duration: 16 weeks
Client: Graham Sibbald & Kenningtons
Completed: December 2022
View Case StudyComplete office refurbishment at Mortimer House, Clapham
Value: £545,000
Duration: 14 weeks
Client: Columbia Threadneedle Investments
Completed: January 2022
View Case StudyRefurbishment of floors 5 and 8 of Northumberland House, High Holborn
Value: £330,000
Completed: March 2023
View Case StudyExternal refurbishment of industrial units at The Exchange, Ipswich
Duration: 31 weeks
Client: Workman LLP
Completed: February 2023
View Case StudyAmalgamation of 3 units at The Glades
Duration: 14 weeks
Client: Alaska UK
Completed: March 2023
View Case StudyNike up size project at the London Designer Outlet
Value: £700,000
Duration: 14 weeks
Client: Quintain
Completed: February 2022
View Case StudyDemolition of existing and build of new Little Clacton store
Value: £14,500,000
Duration: 52 weeks
Client: Morrisons
Completed: July 2022
View Case StudyWaitrose Headington internal refurbishment
Value: £2,000,000
Duration: 10 weeks
Client: Waitrose and Partners
Completed: November 2022
View Case StudyRefrigeration renovation and store update, Diss
Value: £2,600,000
Duration: 27 weeks inc. Christmas break
Client: Morrisons
Completed: February 2023
View Case StudyMorrisons Chelmsford new store
Value: £2,000,000
Duration: 15 weeks
Client: Morrisons
Completed: February 2023
Claremont Parkway Care Home, Kettering, Care Home refurbishment
Duration: 25 weeks
Client: Barchester Healthcare Ltd
Completed: September 2022
The Cedars, Bourne, Care Home refurbishment
Duration: 20 weeks
Client: Barchester Healthcare Ltd
Completed: May 2022
Office refurbishment, 32 Ludgate Hill, London
Value: £120,000
Duration: 10 weeks
Completed: November 2021
Cat A office refurbishment, Croxley Park, Watford
Value: £240,000
Duration: 12 weeks
Completed: June 2021
Office refurbishment, 95 Aldwych Street, London
Value: £130,000
Duration: 11 weeks
Client: Hartnell Taylor Cook
Completed: May 2021
Waitrose refurbishment Alcester
Value: £1,500,000
Duration: 8 weeks
Client: Waitrose/ John Lewis Partnership
Completed: June 2021
Adidas Upsize at London Designer Outlet
Value: £450,000
Duration: 15 weeks
Client: Realm Asset Management
Completed: March 2021
View Case StudyDesign, build and install of roof conservatory at St Pancras Hospital
Value: £65,000
Duration: 6 weeks
Client: Camden & Islington NHS Foundation Trust
Completed: May 2021
View Case StudyPhase 2 warehouse refurbishment works at Jewson Ruislip
Value: £280,000
Duration: 12 weeks
Client: Saint-Gobain Building Distribution
Completed: March 2021
Fit out of new private medical facility
Value: £1,500,000
Duration: 21 weeks
Client: Med24 Limited
Completed: January 2021
View Case StudyCovid-19 vaccinations unit, St Leonards Hospital
Value: £40,000
Duration: 8 days
Client: NHS Property Services Ltd
Completed: December 2020
External refurbishment St John Street, Clerkenwell
Value: £200,000
Duration: 12 weeks
Client: Daniel Watney
Completed: December 2020
Refurbishment to create Social Prescribing Hub
Value: £135,000
Duration: 5 weeks
Client: NHS Property Services Ltd
Completed: December 2020
Fresh Look upgrade Retford store
Value: £2,800,000
Duration: 18 weeks
Client: Morrisons
Completed: November 2020
View Case StudyPublic realm enhancement project – Notting Dale Village Campus
Value: £1,200,000
Duration: 20 weeks
Client: Gerald Eve LLP
Completed: November 2020
View Case StudyFlooring replacement following flood damage
Value: £40,000
Duration: 3 weeks
Client: Peterborough United Football Club
Completed: October 2020
Former Waitrose store conversion, Oadby
Value: £1,600,000
Duration: 18 weeks
Client: Lidl UK
Completed: September 2020
Phase 2, entrance improvement project at Grand Central Train Station Birmingham
Client: Workman LLP
Completed: September 2020
Replacement tenant and advertising signage, Grafton Centre, Cambridge
Client: Bidwells
Completed: September 2020
New store, Southend-on-Sea
Value: £900,000
Duration: 13 weeks
Client: Lidl UK
Completed: August 2020
View Case StudyFire damage repairs toThe Progression Centre, Hemel Hempstead
Value: £1,100,000
Duration: 31 weeks
Client: Fire damage repairs toThe Progression Centre, Hemel Hempstead
Completed: September 2020
Insurance repairs and remedial works, Thurleigh
Value: £65,000
Duration: 10 weeks
Client: Insurance repairs and remedial works, Thurleigh
Completed: September 2020
Former Co-op store conversion, Glenfield
Value: £4,100,000
Duration: 22 weeks
Client: Former Co-op store conversion, Glenfield
Completed: August 2020
Cafe refurbishment – Retford
Client: Morrisons - Cafe refurbishment - Retford
Completed: August 2020
Office refurbishment following flood damage
Duration: 12 weeks
Client: Unite the Union
Completed: August 2020
Covid-19 workplace protection screens
Duration: 1 day
Client: Buckles Solicitors LLP
Completed: July 2020
Category A office refurbishment, London
Value: £120,000
Duration: 12 week
Client: Zurich Assurance Ltd
Completed: June 2020
St Pancras Hospital refurbishment
Value: £40,000
Duration: 3 weeks
Client: Camden and Islington NHS Trust
Completed: March 2020
Construction of new warehouse and refurbishment to existing building at Jewson Ruislip
Value: £870,000
Duration: 20 weeks
Client: Saint-Gobain Building Distribution
Completed: July 2020
View Case StudyOffice extension and refurbishment
Value: £111,000
Duration: 13 weeks
Client: Colas UK
Completed: October 2020
Façade refurbishment on Oxford Street, London
Value: £60,000
Duration: 5 weeks
Client: Workman LLP
Completed: October 2020
Refurbishment of industrial unit, Hornsey
Value: £260,000
Duration: 10 weeks
Client: Workman LLP
Completed: June 2020
View Case StudyOffice refurbishment
Value: £150,000
Duration: 6 weeks
Client: Vaages Surveying/Dencora
Completed: January 2020
View Case StudyWhite box works to eight retail units
Value: £650,000
Duration: 12 weeks
Client: The Grafton
Completed: October 2019
View Case StudyNew Street mall refurbishment – Grand Central station
Value: £960,000
Duration: 14 weeks
Client: Workman LLP
Completed: October 2019
View Case StudyLondon Designer Outlet – Wagamamas Extension
Value: £500,000
Duration: 11 weeks
Client: Realm
Completed: December 2019
View Case StudyPhase 5 sprinkler upgrades at centre:mk – Eagle & Field Walk
Value: £3,180,000
Duration: 48 weeks
Client: Hermes CMK General Partner Ltd
Completed: September 2019
View Case StudyHickathrift House Care Home refurbishment
Value: £300,000
Duration: 15 weeks
Client: Barchester Healthcare Ltd
Completed: September 2019
View Case StudyWood Grange Care Home refurbishment
Value: £280,000
Duration: 14 weeks
Client: Barchester Healthcare Ltd
Completed: August 2019
View Case StudyRefurbishment of Rushden store
Value: £700,000
Duration: 10 weeks
Client: Lidl UK
Completed: August 2019
New store creation in Canning Town
Value: £3,500,000
Duration: 18.5 weeks
Client: Morrisons
Completed: October 2019
View Case StudyFresh Look upgrade and reconfiguration at Letchworth store
Value: £2,500,000
Duration: 19 weeks
Client: Morrisons
Completed: September 2019
Refurbishment of Masters Court office complex
Value: £600,000
Duration: 13 weeks
Client: Vaages Surveying
Completed: July 2019
View Case StudyFit out of 4 storey office block, Hainault
Value: £525,000
Duration: 14 weeks
Client: Keningtons LLP
Completed: July 2019
View Case StudyLongueville Court Care Home refurbishment
Value: £430,000
Duration: 17 weeks
Client: Barchester Healthcare Ltd
Completed: May 2019
View Case StudyWMS Hoddesdon Fresh Look
Value: £1,100,000
Duration: 6 weeks
Client: Morrisons
Completed: April 2019
View Case StudyInternal and external refurbishment of production unit
Value: £325,000
Duration: 8 weeks
Client: Tuffin Ferraby Taylor LLP
Completed: April 2019
View Case StudyRetail unit conversion at intu Uxbridge
Value: £2,800,000
Duration: 36 weeks
Client: intu
Completed: January 2019
View Case StudyConstruction of aviaries at East Winch Wildlife Centre
Duration: 14 weeks
Client: RSPCA
Completed: November 2018
View Case StudyConversion works at Daleham Gardens Health Centre
Value: £270,000
Duration: 11 weeks
Client: Camden and Islington NHS trust
Completed: March 2019
Fresh Look upgrade to Wood Green store
Value: £3,750,000
Duration: 20 weeks
Client: Morrisons
Completed: November 2018
View Case StudyExtension and refurbishment of Pitsea store
Value: £1,400,000
Duration: 18 weeks
Client: Lidl UK
Completed: November 2018
View Case StudyRose Lodge Care Home refurbishment
Value: £250,000
Duration: 14 weeks
Client: Barchester Healthcare Ltd
Completed: January 2019
View Case StudyExtension and Fresh Look upgrade to Sidcup store
Value: £3,800,000
Duration: 22 weeks
Client: Morrisons
Completed: November 2018
View Case StudyMusicians’ Union internal and external refurbishment
Value: £293,000
Duration: 13 weeks
Client: Musicians' Union
Completed: October 2018
Morrisons Grantham Fresh Look
Value: £1,200,000
Duration: 9 weeks
Client: Morrisons
Completed: October 2018
View Case StudyExtension and Fresh Look Refurbishment, Welwyn Garden City
Value: £2,646,000
Duration: 20 weeks
Client: Morrisons
Completed: November 2017
View Case StudyHome Shopping Pods and Canopies
Value: £1,130,000
Duration: 15 weeks
Client: Morrisons
Completed: November 2017
View Case StudyExtension and Refurbishment of St Albans Store
Value: £3,200,000
Duration: 22 weeks
Client: Morrisons
Completed: November 2017
View Case StudyRefurbishment of Chater Lodge Care Home, Stamford
Value: £220,000
Duration: 12 weeks
Client: Barchester Healthcare Limited
Completed: August 2018
Refurbishment of Industrial Unit, Unit E Chiltern Park
Value: £1,440,000
Duration: 20 weeks
Client: ML Accessories Ltd
Completed: April 2018
View Case StudyWerrington Lodge Care Home refurbishment
Value: £240,000
Duration: 12 weeks
Client: Barchester Healthcare Ltd
Completed: March 2018
View Case StudyPhase 3 sprinkler upgrades at centre:mk
Value: £1,200,000
Duration: 20 weeks
Client: Hermes Plc
Completed: April 2018
View Case StudyInternal and external refurbishment works
Value: £330,000
Duration: 8 weeks
Client: Greencore Group
Completed: March 2018
View Case StudyOutpatient Department refurbishment at Hammersmith Hospital
Value: £1,500,000
Duration: 52 weeks
Client: Imperial NHS Trust
Completed: November 2017
View Case Study95 Aldwych, London, roof replacement and external decoration
Value: £230,000
Duration: 16 weeks
Client: Hartnell Taylor Cook LLP
Completed: October 2017
Strip out of former BHS unit at centre:mk
Value: £1,100,000
Duration: 14 weeks
Client: Workman LLP
Completed: September 2017
Collingtree Park Care Home refurbishment
Value: £210,000
Duration: 12 weeks
Client: Barchester Healthcare Ltd
Completed: August 2017
Deer Walk Guest Services Lounge centre:mk
Value: £5,800,000
Duration: 44 weeks
Client: Hermes CMK General Partner Ltd
Completed: June 2017
View Case StudyWarehouse refurbishment to create new CTD Centre, Lincoln
Value: £160,000
Duration: 9 weeks
Client: Saint Gobain
Completed: July 2017
Communal areas refurbishment, Charles Street London
Value: £422,000
Duration: 12 weeks
Client: Keningtons LLP
Completed: March 2017
Creation of Pathology Lab, Charing Cross Hospital
Value: £170,000
Duration: 5 weeks
Client: Imperial College Healthcare NHS Trust
Completed: June 2017
Cassio Metro Leisure Centre, fire damage repairs
Value: £830,000
Duration: 36 weeks
Client: Arun Associates
Completed: May 2017
Development of Manor Field Residential Facility
Value: £325,000
Duration: 12 weeks
Client: The Priory Group (Craegmoor)
Completed: August 2016
Farmfield & Thornford Park Anti-Ligature Works
Value: £860,000
Duration: Completed over a 3 year period
Client: The Priory Group (Priory Healthcare)
Completed: September 2016
Refurbishment of The Oaks Care Home
Value: £425,000
Duration: 36 weeks
Client: The Priory Group (Amore Care)
Completed: March 2015
Refurbishment of Belhaven Care Home
Value: £220,000
Duration: 8 weeks
Client: The Priory Group
Completed: July 2015
Strip out and landlord enabling works, Queensgate Shopping Centre
Value: £400,000
Duration: 11 weeks
Client: Redevco
Completed: January 2017
Extension and improvements to store and petrol filling station, Chingford
Value: £4,125,000
Duration: 26 weeks
Client: Wm Morrison Supermarkets
Completed: January 2017
View Case StudyPriority Plumbing Refurbishment, New Southgate, London
Value: £110,000
Duration: 6 weeks
Client: Saint Gobain
Completed: February 2017
Extension and Alterations to Broomwood Surgery
Value: £1,000,000
Duration: 35 weeks
Client: Drs Bamberger & Lasrado
Completed: December 2016
Sunset Walk refurbishment the centre:mk
Value: £7,500,000
Duration: 38 weeks
Client: Hermes CMK General Partner Ltd
Completed: December 2016
View Case StudyReinstatement of domestic dwelling after fire damage
Value: £65,000
Duration: 20 weeks
Client: Quantum Survey Management
Completed: July 2016
View Case StudyFresh Look reformat, Morrisons Maldon
Value: £400,000
Duration: 4 weeks
Client: Wm Morrison Supermarkets
Completed: October 2016
Critical Refrigeration, Morrisons Leighton Buzzard
Value: £1,100,000
Duration: 12 weeks
Client: Wm Morrison Supermarkets
Completed: August 2016
Office Refurbishment, Sol House, Northampton
Value: £1,000,000
Duration: 16 weeks
Client: Workman LLP / Simply Business
Completed: October 2016
Fresh Look reformat, Morrisons Cambourne
Value: £400,000
Duration: 5 weeks
Client: Wm Morrison Supermarkets
Completed: September 2016
Extension of Primrose unit oncology ward
Value: £440,000
Duration: 16 weeks
Client: Bedford Hospital NHS Trust
Completed: September 2016
View Case StudyTemple Lodge external upgrades
Value: £130,000
Duration: 12 weeks
Client: Abbey Commercial Ltd
Completed: September 2016
Structural alterations and landlord enabling works
Value: £90,000
Duration: 6 weeks
Client: INTU Chapelfield Shopping Centre
Completed: September 2016
Internal alterations to convert single dwelling into two dwellings
Value: £82,000
Duration: 12 weeks
Client: Longhurst and Havelock Homes
Completed: September 2016
Fresh Look reformat, Morrisons Eastwood
Value: £660,000
Duration: 5 weeks
Client: Wm Morrison Supermarkets
Completed: September 2016
Essential refrigeration works & Fresh Look, Morrisons Northampton
Value: £1,300,000
Duration: 10 weeks
Client: Wm Morrison Supermarkets
Completed: September 2016
Conversion of flats into classrooms
Value: £42,000
Duration: 5 weeks
Client: The Priory Group
Completed: September 2016
Conversion of domestic dwelling to 6 bed care home
Value: £215,000
Duration: 12 weeks
Client: The Priory Group
Completed: August 2016
Undercroft extension of retail unit at INTU Chapelfield Shopping Centre Norwich for Cafe Nero
Value: £150,000
Duration: 16 weeks
Client: INTU Properties PLC
Completed: August 2016
Westpoint car park extension
Value: £1,840,000
Duration: 16 weeks
Client: SPCP GROUP III LOPD 14
Completed: July 2016
Fresh Look Store Re-fit Morrisons Felixstowe
Value: £400,000
Duration: 4 weeks
Client: Wm Morrison Supermarkets
Completed: June 2016
Eight Instore Cafe Re-fits
Value: £400,000
Duration: 8 weeks
Client: Wm Morrison Supermarkets
Completed: May 2016
Refurbishment of Jim Gillespie House Care Home
Value: £180,000
Duration: 14 weeks
Client: Abbeyfield Care
Completed: May 2016
Office Refurbishment Phase 2, Medina House, Milton Keynes
Value: £530,000
Duration: 12 weeks
Client: Dencora (2000) Ltd
Completed: May 2016
West Oak Care Home Refurbishment
Value: £180,000
Duration: 10 weeks
Client: Barchester Healthcare
Completed: May 2016
Additional security measures at Queensgate Shopping Centre car parks
Value: £1,300,000
Duration: 12 months
Client: Queensgate Shopping Centre
Completed: May 2016
View Case StudyReigate Beaumont Care Home Refurbishment
Value: £160,000
Duration: 10 weeks
Client: Barchester Healthcare
Completed: May 2016
New Store Fit-out, Morrisons, Colindale
Value: £4,000,000
Duration: 14 weeks
Client: Wm Morrison Supermarkets
Completed: March 2016
View Case StudyOffice Refurbishment, Medina House, Milton Keynes
Value: £600,000
Duration: 10 weeks
Client: Dencora (2000) Limited
Completed: February 2016
Flat conversion project
Value: £160,000
Duration: 12 weeks
Client: Danshell
Completed: February 2016
Extension & Refurbishment of Care Home
Value: £630,000
Duration: 32 weeks
Client: Together for Mental Wellbeing
Completed: February 2016
View Case StudyRefurbishment of Ward 7a, Lister Hospital
Value: £270,000
Duration: 8 weeks
Client: East & North Herts NHS Trust
Completed: December 2015
View Case StudyMajor Alterations Work to Live Jewson Store
Value: £750,000
Duration: 21 weeks
Client: Jewson Saint-Gobain Ltd
Completed: October 2015
Reconfiguration & Refurbishment of The Priory Hospital, Heathfield
Value: £340,000
Duration: 10 weeks
Client: The Priory Group
Completed: October 2015
Works in Lieu of Dilapidations at 20–22 Berkeley Square, London
Value: £40,000
Duration: 4 weeks
Client: Keningtons LLP
Completed: September 2015
Refurbishment of Agricultural Building
Value: £265,000
Duration: 10 weeks
Client: East of England Agricultural Society
Completed: September 2015
Refurbishment and alterations to Nissan Showroom
Value: £200,000
Duration: 12 weeks
Client: Smiths Motor Group
Completed: September 2015
Jack Hunt School, Life Cycle Works
Value: £327,000
Duration: 5 weeks
Client: Bouygues UK
Completed: September 2015
Window Replacements Bevington Primary School
Value: £350,000
Duration: 5 weeks
Client: Amey
Completed: August 2015
Children’s Home Refurbishment, Ipswich
Value: £220,000
Duration: 8 weeks
Client: Priory Group
Completed: July 2015
Westgate Arcade Refurbishment, Queensgate Shopping Centre
Value: £410,000
Duration: 12 weeks
Client: Queensgate Shopping Centre
Completed: July 2015
View Case Study900 Pavillion Drive Office Refurbishment
Value: £365,000
Duration: 26 weeks
Client: Zurich Assurance
Completed: June 2015
Venture Park Refurbishment of Offices and Commercial Units
Value: £420,000
Duration: 11 weeks
Client: Zurich Assurance
Completed: March 2015
Internal Refurbishment of Donington Church Hall
Value: £40,000
Duration: 9 weeks
Client: Donington Church PCC
Completed: March 2015
Bedford Hospital Endoscopy Refurbishment Phase 2
Value: £400,000
Duration: 8 weeks
Client: Bedford Hospital NHS Trust
Completed: March 2015
Internal Alterations and Refurbishment, Western House, Lynchwood
Value: £312,000
Duration: 12 weeks
Client: Dencora Peterborough LLP
Completed: March 2015
Office Fit out at Unison Centre, Kings Cross
Value: £185,000
Duration: 8 weeks
Client: Unison
Completed: March 2015
Office Refurbishment, Chelmsford
Value: £160,000
Duration: 6 weeks
Client: Threadneedle UK Property Trust
Completed: February 2015
Extension for Giles Brook School, Milton Keynes
Value: £195,000
Duration: 18 weeks
Client: Giles Brook School
Completed: January 2015
Morrison’s Critical Refrigeration Works, Peckham
Value: £1,100,000
Duration: 14 weeks
Client: WM Morrison Supermarkets PLC
Completed: December 2014
Refurbishment of Fire Damaged Industrial Units
Value: £825,000
Duration: 24 weeks
Client: Belljoy Limited
Completed: December 2014
Corporate Identity Refresh to Vauxhall Showroom
Value: £154,000
Duration: 15 weeks
Client: Smiths Motor Group
Completed: October 2014
Faringdon Lodges Refurbishment
Value: £350,000
Duration: 42 weeks
Client: The National Trust
Completed: September 2014
Sue Ryder Hospice
Value: £950,000
Duration: 26 Weeks
Client: Sue Ryder
Completed: May 2014
View Case StudyBarratt Industrial Park Refurbishment
Value: £345,000
Duration: 20 weeks
Client: Workman LLP
Completed: May 2014
Bedford Hospital NHS Trust
Value: £500,000
Duration: 26 Weeks
Client: Bedford Hospital NHS Trust
Completed: February 2014
View Case StudyNewlands Shopping Centre Lighting & Ceiling Refit
Value: £400,000
Duration: 16 weeks
Client: Ellandi
Completed: November 2013
Industrial Unit Refurbishment, Leamington Spa
Value: £375,000
Duration: 12 weeks
Client: Transco
Completed: October 2013
Refurbishment and Anti-Ligature Works, Chadwick Lodge
Value: £358,000
Duration: 22 weeks
Client: The Priory Group
Completed: September 2013
Extension to Accommodate Fitness Suite
Value: £380,000
Duration: 16 weeks
Client: The Kings (Cathedral) School, Peterborough
Completed: August 2013
New Hyundai Retail Outlet for Smith Motor Group
Value: £560,000
Duration: 32 weeks
Client: Smiths Motor Group
Completed: August 2013
Rebranding of Oxfam Store, Bury St Edmunds
Value: £80,000
Duration: 9 weeks
Client: Oxfam Property Services
Completed: August 2013
Refurbishment and New Build, International Timber
Value: £3,000,000
Duration: 16 weeks
Client: International Timber
Completed: June 2013
Remodelling of Offices, W M Morrison, Swan Valley
Value: £470,000
Duration: 16 weeks
Client: W M Morrison
Completed: May 2013
Extension to Create Two New Classrooms
Value: £151,000
Duration: 14 weeks
Client: Barnack CE Primary School
Completed: March 2013
Refurbishment of Office Complex
Value: £81,500
Duration: 5 weeks
Client: UNITE Union
Completed: November 2012
Frys Court, OCHA
Value: £420,000
Duration: 34 Weeks
Client: Oxford Citizens Housing Association
Completed: August 2012
View Case StudyRefurbishment of Residential Property
Value: £115,000
Duration: 30 weeks
Client: Merton College
Completed: August 2012
Longthorpe Hall Hospice Refurbishment
Value: £74,000
Duration: 15 weeks
Client: Sue Ryder Care
Completed: July 2012
Sheltered Housing Refurbishment & Construction
Value: £420,000
Duration: 20 weeks
Client: Catalyst Housing Ltd
Completed: July 2012
Void Cottage Refurbishment
Value: £48,000
Duration: 11 weeks
Client: The National Trust
Completed: June 2011
Conversion of Old Retort House, Cliveden House
Value: £35,000
Duration: 6 weeks
Client: The National Trust
Completed: May 2011
Craegmoor Group Refurbishment
Value: £690,000
Duration: 20 Weeks
Client: Craegmoor Group
Completed: February 2011
View Case Study