The arcade received a full redecoration, with the application of a contemporary grey colour scheme. New floor tiling complemented the new paintwork and original features such as the mosaic tiled doorways were replicated at each store front to maintain a uniform look throughout the arcade. Low energy LED lighting was installed throughout, enhancing the bright airy feel of the arcade and also helping to keep running and maintenance costs to a minimum.
Particular emphasis was made to keeping all of the retailers informed of the progress of the works and Princebuild worked with the Queensgate Centre to produce newsletters throughout the project to assist with the regular communication needed to make the project a success.
The final stage was to install new signage to each of the units and this completed the smart, stylish appearance of the arcade, giving it a consistent look and feel throughout.
The project was completed on time and to the satisfaction of not only the Queensgate Centre but also that of the retailers in the arcade.