Project: | Covid-19 vaccinations unit, St Leonards Hospital |
Value: | £40,000 |
Duration: | 8 days |
Client: | NHS Property Services Ltd |
Completed: | December 2020 |
Project: | External refurbishment St John Street, Clerkenwell |
Value: | £200,000 |
Duration: | 12 weeks |
Client: | Daniel Watney |
Completed: | December 2020 |
Project: | Refurbishment to create Social Prescribing Hub |
Value: | £135,000 |
Duration: | 5 weeks |
Client: | NHS Property Services Ltd |
Completed: | December 2020 |
Project: | Fresh Look upgrade Retford store |
Value: | £2,800,000 |
Duration: | 18 weeks |
Client: | Morrisons |
Completed: | November 2020 |
Project: | Public realm enhancement project - Notting Dale Village Campus |
Value: | £1,200,000 |
Duration: | 20 weeks |
Client: | Gerald Eve LLP |
Completed: | November 2020 |
Project: | Façade refurbishment on Oxford Street, London |
Value: | £60,000 |
Duration: | 5 weeks |
Client: | Workman LLP |
Completed: | October 2020 |
Project: | Flooring replacement following flood damage |
Value: | £40,000 |
Duration: | 3 weeks |
Client: | Peterborough United Football Club |
Completed: | October 2020 |
Project: | Office extension and refurbishment |
Value: | £111,000 |
Duration: | 13 weeks |
Client: | Colas UK |
Completed: | October 2020 |
Project: | Former Waitrose store conversion, Oadby |
Value: | £1,600,000 |
Duration: | 18 weeks |
Client: | Lidl UK |
Completed: | September 2020 |
Project: | Fire damage repairs toThe Progression Centre, Hemel Hempstead |
Value: | £1,100,000 |
Duration: | 31 weeks |
Client: | Workman LLP |
Completed: | September 2020 |
Project: | Insurance repairs and remedial works, Thurleigh |
Value: | £65,000 |
Duration: | 10 weeks |
Completed: | September 2020 |
Project: | Phase 2, entrance improvement project at Grand Central Train Station Birmingham |
Client: | Workman LLP |
Completed: | September 2020 |
Project: | Replacement tenant and advertising signage, Grafton Centre, Cambridge |
Client: | Bidwells |
Completed: | September 2020 |
Project: | Former Co-op store conversion, Glenfield |
Value: | £4,100,000 |
Duration: | 22 weeks |
Client: | Morrisons |
Completed: | August 2020 |
Project: | New store, Southend-on-Sea |
Value: | £900,000 |
Duration: | 13 weeks |
Client: | Lidl UK |
Completed: | August 2020 |
Project: | Cafe refurbishment - Retford |
Client: | Morrisons |
Completed: | August 2020 |
Project: | Office refurbishment following flood damage |
Duration: | 12 weeks |
Client: | Unite the Union |
Completed: | August 2020 |
Project: | Covid-19 workplace protection screens |
Duration: | 1 day |
Client: | Buckles Solicitors LLP |
Completed: | July 2020 |
Project: | Conversion of former Co-op store in Stirchley |
Client: | Morrisons |
Completed: | July 2020 |
Project: | Construction of new warehouse and refurbishment to existing building at Jewson Ruislip |
Value: | £870,000 |
Duration: | 20 weeks |
Client: | Saint-Gobain Building Distribution |
Completed: | July 2020 |
Project: | Refurbishment of industrial unit, Hornsey |
Value: | £260,000 |
Duration: | 10 weeks |
Client: | Workman LLP |
Completed: | June 2020 |
Project: | Category A office refurbishment, London |
Value: | £120,000 |
Duration: | 12 week |
Client: | Zurich Assurance Ltd |
Completed: | June 2020 |
Project: | Covid-19 workplace protection screens |
Client: | NHS Property Services Ltd |
Completed: | May 2020 |
Project: | Morrisons Bradwell - Store conversion |
Duration: | 7 weeks |
Client: | Morrisons |
Completed: | April 2020 |
Project: | Morrisons Worksop - Freshlook launch |
Duration: | 8 weeks |
Client: | Morrisons |
Completed: | March 2020 |
Project: | St Pancras Hospital refurbishment |
Value: | £40,000 |
Duration: | 3 weeks |
Client: | Camden and Islington NHS Trust |
Completed: | March 2020 |
Project: | Office refurbishment |
Value: | £150,000 |
Duration: | 6 weeks |
Client: | Vaages Surveying/Dencora |
Completed: | January 2020 |
Project: | London Designer Outlet – Wagamamas Extension |
Value: | £500,000 |
Duration: | 11 weeks |
Client: | Realm |
Completed: | December 2019 |
Project: | White box works to eight retail units |
Value: | £650,000 |
Duration: | 12 weeks |
Client: | The Grafton |
Completed: | October 2019 |
Project: | New Street Mall Refurbishment – Grand Central Station |
Value: | £960,000 |
Duration: | 14 weeks |
Client: | Workman LLP |
Completed: | October 2019 |
Project: | New store creation in Canning Town |
Value: | £3,500,000 |
Duration: | 18.5 weeks |
Client: | Morrisons |
Completed: | October 2019 |
Project: | Phase 5 sprinkler upgrades at centre:mk - Eagle & Field Walk |
Value: | £3,180,000 |
Duration: | 48 weeks |
Client: | Hermes CMK General Partner Ltd |
Completed: | September 2019 |
Project: | Hickathrift House Care Home refurbishment |
Value: | £300,000 |
Duration: | 15 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | September 2019 |
Project: | Fresh Look upgrade and reconfiguration at Letchworth store |
Value: | £2,500,000 |
Duration: | 19 weeks |
Client: | Morrisons |
Completed: | September 2019 |
Project: | Refurbishment of Rushden store |
Value: | £700,000 |
Duration: | 10 weeks |
Client: | Lidl UK |
Completed: | August 2019 |
Project: | Wood Grange Care Home refurbishment |
Value: | £280,000 |
Duration: | 14 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | August 2019 |
Project: | Refurbishment of Masters Court office complex |
Value: | £600,000 |
Duration: | 13 weeks |
Client: | Vaages Surveying |
Completed: | July 2019 |
Project: | Fit out of 4 storey office block, Hainault |
Value: | £525,000 |
Duration: | 14 weeks |
Client: | Keningtons LLP |
Completed: | July 2019 |
Project: | Longueville Court Care Home refurbishment |
Value: | £430,000 |
Duration: | 17 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | May 2019 |
Project: | Internal and external refurbishment of production unit |
Value: | £325,000 |
Duration: | 8 weeks |
Client: | Tuffin Ferraby Taylor LLP |
Completed: | April 2019 |
Project: | WMS Hoddesdon Fresh Look |
Value: | £1,100,000 |
Duration: | 6 weeks |
Client: | Morrisons |
Completed: | April 2019 |
Project: | Conversion works at Daleham Gardens Health Centre |
Value: | £270,000 |
Duration: | 11 weeks |
Client: | Camden and Islington NHS trust |
Completed: | March 2019 |
Project: | Retail unit conversion at intu Uxbridge |
Value: | £2,800,000 |
Duration: | 36 weeks |
Client: | intu |
Completed: | January 2019 |
Project: | Rose Lodge Care Home refurbishment |
Value: | £250,000 |
Duration: | 14 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | January 2019 |
Project: | Extension and refurbishment of Pitsea store |
Value: | £1,400,000 |
Duration: | 18 weeks |
Client: | Lidl UK |
Completed: | November 2018 |
Project: | Fresh Look upgrade to Wood Green store |
Value: | £3,750,000 |
Duration: | 20 weeks |
Client: | Morrisons |
Completed: | November 2018 |
Project: | Construction of aviaries at East Winch Wildlife Centre |
Duration: | 14 weeks |
Client: | RSPCA |
Completed: | November 2018 |
Project: | Extension and Fresh Look upgrade to Sidcup store |
Value: | £3,800,000 |
Duration: | 22 weeks |
Client: | Morrisons |
Completed: | November 2018 |
Project: | Morrisons Grantham Fresh Look |
Value: | £1,200,000 |
Duration: | 9 weeks |
Client: | Morrisons |
Completed: | October 2018 |
Project: | Musicians' Union internal and external refurbishment |
Value: | £293,000 |
Duration: | 13 weeks |
Client: | Musicians' Union |
Completed: | October 2018 |
Project: | Refurbishment of Chater Lodge Care Home, Stamford |
Value: | £220,000 |
Duration: | 12 weeks |
Client: | Barchester Healthcare Limited |
Completed: | August 2018 |
Project: | Refurbishment of Industrial Unit, Unit E Chiltern Park |
Value: | £1,440,000 |
Duration: | 20 weeks |
Client: | ML Accessories Ltd |
Completed: | April 2018 |
Project: | Phase 3 sprinkler upgrades at centre:mk |
Value: | £1,200,000 |
Duration: | 20 weeks |
Client: | Hermes Plc |
Completed: | April 2018 |
Project: | Werrington Lodge Care Home refurbishment |
Value: | £240,000 |
Duration: | 12 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | March 2018 |
Project: | Internal and external refurbishment works |
Value: | £330,000 |
Duration: | 8 weeks |
Client: | Greencore Group |
Completed: | March 2018 |
Project: | Creation of two semi-detached bungalows |
Duration: | 6 months |
Client: | King’s Lynn West Norfolk Council |
Completed: | January 2018 |
Project: | Extension and Refurbishment of St Albans Store |
Value: | £3,200,000 |
Duration: | 22 weeks |
Client: | Morrisons |
Completed: | November 2017 |
Project: | Extension and Fresh Look Refurbishment, Welwyn Garden City |
Value: | £2,646,000 |
Duration: | 20 weeks |
Client: | Morrisons |
Completed: | November 2017 |
Project: | Outpatient Department refurbishment at Hammersmith Hospital |
Value: | £1,500,000 |
Duration: | 52 weeks |
Client: | Imperial NHS Trust |
Completed: | November 2017 |
Project: | Home Shopping Pods and Canopies |
Value: | £1,130,000 |
Duration: | 15 weeks |
Client: | Morrisons |
Completed: | November 2017 |
Project: | 95 Aldwych, London, roof replacement and external decoration |
Value: | £230,000 |
Duration: | 16 weeks |
Client: | Hartnell Taylor Cook LLP |
Completed: | October 2017 |
Project: | Strip out of former BHS unit at centre:mk |
Value: | £1,100,000 |
Duration: | 14 weeks |
Client: | Workman LLP |
Completed: | September 2017 |
Project: | Collingtree Park Care Home refurbishment |
Value: | £210,000 |
Duration: | 12 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | August 2017 |
Project: | Warehouse refurbishment to create new CTD Centre, Lincoln |
Value: | £160,000 |
Duration: | 9 weeks |
Client: | Saint Gobain |
Completed: | July 2017 |
Project: | Creation of Pathology Lab, Charing Cross Hospital |
Value: | £170,000 |
Duration: | 5 weeks |
Client: | Imperial College Healthcare NHS Trust |
Completed: | June 2017 |
Project: | Deer Walk Guest Services Lounge centre:mk |
Value: | £5,800,000 |
Duration: | 44 weeks |
Client: | Hermes CMK General Partner Ltd |
Completed: | June 2017 |
Project: | Cassio Metro Leisure Centre, fire damage repairs |
Value: | £830,000 |
Duration: | 36 weeks |
Client: | Arun Associates |
Completed: | May 2017 |
Project: | Communal areas refurbishment, Charles Street London |
Value: | £422,000 |
Duration: | 12 weeks |
Client: | Keningtons LLP |
Completed: | March 2017 |
Project: | Priority Plumbing Refurbishment, New Southgate, London |
Value: | £110,000 |
Duration: | 6 weeks |
Client: | Saint Gobain |
Completed: | February 2017 |
Project: | Extension and improvements to store and petrol filling station, Chingford |
Value: | £4,125,000 |
Duration: | 26 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | January 2017 |
Project: | Strip out and landlord enabling works, Queensgate Shopping Centre |
Value: | £400,000 |
Duration: | 11 weeks |
Client: | Redevco |
Completed: | January 2017 |
Project: | Extension and Alterations to Broomwood Surgery |
Value: | £1,000,000 |
Duration: | 35 weeks |
Client: | Drs Bamberger & Lasrado |
Completed: | December 2016 |
Project: | Sunset Walk refurbishment the centre:mk |
Value: | £7,500,000 |
Duration: | 38 weeks |
Client: | Hermes CMK General Partner Ltd |
Completed: | December 2016 |
Project: | Fresh Look reformat, Morrisons Maldon |
Value: | £400,000 |
Duration: | 4 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | October 2016 |
Project: | Office Refurbishment, Sol House, Northampton |
Value: | £1,000,000 |
Duration: | 16 weeks |
Client: | Workman LLP / Simply Business |
Completed: | October 2016 |
Project: | Fresh Look reformat, Morrisons Cambourne |
Value: | £400,000 |
Duration: | 5 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | September 2016 |
Project: | Farmfield & Thornford Park Anti-Ligature Works |
Value: | £860,000 |
Duration: | Completed over a 3 year period |
Client: | The Priory Group (Priory Healthcare) |
Completed: | September 2016 |
Project: | Fresh Look reformat, Morrisons Eastwood |
Value: | £660,000 |
Duration: | 5 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | September 2016 |
Project: | Internal alterations to convert single dwelling into two dwellings |
Value: | £82,000 |
Duration: | 12 weeks |
Client: | Longhurst and Havelock Homes |
Completed: | September 2016 |
Project: | Structural alterations and landlord enabling works |
Value: | £90,000 |
Duration: | 6 weeks |
Client: | INTU Chapelfield Shopping Centre |
Completed: | September 2016 |
Project: | Temple Lodge external upgrades |
Value: | £130,000 |
Duration: | 12 weeks |
Client: | Abbey Commercial Ltd |
Completed: | September 2016 |
Project: | Conversion of flats into classrooms |
Value: | £42,000 |
Duration: | 5 weeks |
Client: | The Priory Group |
Completed: | September 2016 |
Project: | Extension of Primrose unit oncology ward |
Value: | £440,000 |
Duration: | 16 weeks |
Client: | Bedford Hospital NHS Trust |
Completed: | September 2016 |
Project: | Essential refrigeration works & Fresh Look, Morrisons Northampton |
Value: | £1,300,000 |
Duration: | 10 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | September 2016 |
Project: | Undercroft extension of retail unit at INTU Chapelfield Shopping Centre Norwich for Cafe Nero |
Value: | £150,000 |
Duration: | 16 weeks |
Client: | INTU Properties PLC |
Completed: | August 2016 |
Project: | Development of Manor Field Residential Facility |
Value: | £325,000 |
Duration: | 12 weeks |
Client: | The Priory Group (Craegmoor) |
Completed: | August 2016 |
Project: | Conversion of domestic dwelling to 6 bed care home |
Value: | £215,000 |
Duration: | 12 weeks |
Client: | The Priory Group |
Completed: | August 2016 |
Project: | Critical refrigertaion and Fresh Look, Morrisons Leighton Buzzard |
Value: | £1,100,000 |
Duration: | 12 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | August 2016 |
Project: | Creation of 474 extra parking spaces at Lynchwood Business Park |
Value: | £1,840,000 |
Duration: | 16 weeks |
Client: | SPCP GROUP III LOPD 14 |
Completed: | July 2016 |
Project: | Reinstatement of domestic dwelling after fire damage |
Value: | £65,000 |
Duration: | 20 weeks |
Client: | Quantum Survey Management |
Completed: | July 2016 |
Project: | Fresh Look Store Re-fit Morrisons Felixstowe |
Value: | £400,000 |
Duration: | 4 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | June 2016 |
Project: | Eight Instore Cafe Re-fits |
Value: | £400,000 |
Duration: | 8 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | May 2016 |
Project: | Office Refurbishment Phase 2, Medina House, Milton Keynes |
Value: | £530,000 |
Duration: | 12 weeks |
Client: | Dencora (2000) Ltd |
Completed: | May 2016 |
Project: | Additional security measures at Queensgate Shopping Centre car parks |
Value: | £1,300,000 |
Duration: | 12 months |
Client: | Queensgate Shopping Centre |
Completed: | May 2016 |
Project: | West Oak Care Home Refurbishment |
Value: | £180,000 |
Duration: | 10 weeks |
Client: | Barchester Healthcare |
Completed: | May 2016 |
Project: | Refurbishment of Jim Gillespie House Care Home |
Value: | £180,000 |
Duration: | 14 weeks |
Client: | Abbeyfield Care |
Completed: | May 2016 |
Project: | Reigate Beaumont Care Home Refurbishment |
Value: | £160,000 |
Duration: | 10 weeks |
Client: | Barchester Healthcare |
Completed: | May 2016 |
Project: | Extension & Refurbishment of Care Home |
Value: | £630,000 |
Duration: | 32 weeks |
Client: | Together for Mental Wellbeing |
Completed: | February 2016 |
Project: | New Store Fit-out, Morrisons, Colindale |
Value: | £4,000,000 |
Duration: | 14 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | March 2016 |
Project: | Construction of Chinnor Community Building |
Value: | £1,200,000 |
Duration: | 46 weeks |
Client: | Chinnor Parish Council |
Completed: | February 2016 |
Project: | Conversion of Two Flats to Living Accomodation |
Value: | £160,000 |
Duration: | 12 weeks |
Client: | Danshell |
Completed: | February 2016 |
Project: | Office Refurbishment, Medina House, Milton Keynes |
Value: | £600,000 |
Duration: | 10 weeks |
Client: | Dencora (2000) Limited |
Completed: | February 2016 |
Project: | Refurbishment of Ward 7a, Lister Hospital |
Value: | £270,000 |
Duration: | 8 weeks |
Client: | East & North Herts NHS Trust |
Completed: | December 2015 |
Project: | Major Alterations Work to Live Jewson Store |
Value: | £750,000 |
Duration: | 21 weeks |
Client: | Jewson Saint-Gobain Ltd |
Completed: | October 2015 |
Project: | Reconfiguration & Refurbishment of The Priory Hospital, Heathfield |
Value: | £340,000 |
Duration: | 10 weeks |
Client: | The Priory Group |
Completed: | October 2015 |
Project: | Jack Hunt School, Life Cycle Works |
Value: | £327,000 |
Duration: | 5 weeks |
Client: | Bouygues UK |
Completed: | September 2015 |
Project: | Refurbishment of Agricultural Building |
Value: | £265,000 |
Duration: | 10 weeks |
Client: | East of England Agricultural Society |
Completed: | September 2015 |
Project: | Works in Lieu of Dilapidations at 20–22 Berkeley Square, London |
Value: | £40,000 |
Duration: | 4 weeks |
Client: | Keningtons LLP |
Completed: | September 2015 |
Project: | Smiths Nissan Showroom Refurbishment |
Value: | £200,000 |
Duration: | 12 weeks |
Client: | Smiths Motor Group |
Completed: | September 2015 |
Project: | Replacement of Hardwood Sash Windows |
Value: | £350,000 |
Duration: | 5 weeks |
Client: | Amey |
Completed: | August 2015 |
Project: | Westgate Arcade Refurbishment |
Value: | £410,000 |
Duration: | 12 weeks |
Client: | Queensgate Shopping Centre |
Completed: | July 2015 |
Project: | Refurbishment of Belhaven Care Home |
Value: | £220,000 |
Duration: | 8 weeks |
Client: | The Priory Group |
Completed: | July 2015 |
Project: | Children’s Home Refurbishment, Ipswich |
Value: | £220,000 |
Duration: | 8 weeks |
Client: | Priory Group |
Completed: | July 2015 |
Project: | 900 Pavillion Drive Office Refurbishment |
Value: | £365,000 |
Duration: | 26 weeks |
Client: | Zurich Assurance |
Completed: | June 2015 |
Project: | Internal Alterations and Refurbishment, Western House, Lynchwood |
Value: | £312,000 |
Duration: | 12 weeks |
Client: | Dencora Peterborough LLP |
Completed: | March 2015 |
Project: | Internal Refurbishment of Donington Church Hall |
Value: | £40,000 |
Duration: | 9 weeks |
Client: | Donington Church PCC |
Completed: | March 2015 |
Project: | Venture Park Refurbishment of Offices and Commercial Units |
Value: | £420,000 |
Duration: | 11 weeks |
Client: | Zurich Assurance |
Completed: | March 2015 |
Project: | Refurbishment of The Oaks Care Home |
Value: | £425,000 |
Duration: | 36 weeks |
Client: | The Priory Group (Amore Care) |
Completed: | March 2015 |
Project: | Office Fit out at Unison Centre, Kings Cross |
Value: | £185,000 |
Duration: | 8 weeks |
Client: | Unison |
Completed: | March 2015 |
Project: | Bedford Hospital Endoscopy Refurbishment Phase 2 |
Value: | £400,000 |
Duration: | 8 weeks |
Client: | Bedford Hospital NHS Trust |
Completed: | March 2015 |
Project: | Office Refurbishment, Chelmsford |
Value: | £160,000 |
Duration: | 6 weeks |
Client: | Threadneedle UK Property Trust |
Completed: | February 2015 |
Project: | Extension for Giles Brook School, Milton Keynes |
Value: | £195,000 |
Duration: | 18 weeks |
Client: | Giles Brook School |
Completed: | January 2015 |
Project: | Morrison’s Critical Refrigeration Works, Peckham |
Value: | £1.1 million |
Duration: | 14 weeks |
Client: | WM Morrison Supermarkets PLC |
Completed: | December 2014 |
Project: | Refurbishment of Fire Damaged Industrial Units |
Value: | £825,000 |
Duration: | 24 weeks |
Client: | Belljoy Limited |
Completed: | December 2014 |
Project: | Enstone Parish Hall Internal Fit Out |
Value: | £100,000 |
Duration: | 6 weeks |
Client: | Enstone Parish Council |
Completed: | November 2014 |
Project: | Corporate Identity Refresh to Vauxhall Showroom |
Value: | £154,000 |
Duration: | 15 weeks |
Client: | Smiths Motor Group |
Completed: | October 2014 |
Project: | Faringdon Lodges Refurbishment |
Value: | £350,000 |
Duration: | 42 weeks |
Client: | The National Trust |
Completed: | September 2014 |
Project: | Barratt Industrial Park Refurbishment |
Value: | £345,000 |
Duration: | 20 weeks |
Client: | Workman LLP |
Completed: | May 2014 |
Project: | Duchess of Kent Hospice Refurbishment |
Value: | £950,000 |
Duration: | 26 Weeks |
Client: | Sue Ryder |
Completed: | May 2014 |
Project: | Bedford Hospital Dementia Wards Refurbishment |
Value: | £500,000 |
Duration: | 26 Weeks |
Client: | Bedford Hospital NHS Trust |
Completed: | February 2014 |
Project: | Newlands Shopping Centre Lighting & Ceiling Refit |
Value: | £400,000 |
Duration: | 16 weeks |
Client: | Ellandi |
Completed: | November 2013 |
Project: | Refurbishment of Museum and Gallery |
Value: | £140,000 |
Duration: | 12 weeks |
Client: | Peterborough City Council |
Completed: | November 2013 |
Project: | Industrial Unit Refurbishment, Leamington Spa |
Value: | £375,000 |
Duration: | 12 weeks |
Client: | Transco |
Completed: | October 2013 |
Project: | Refurbishment and Anti-Ligature Works, Chadwick Lodge |
Value: | £358,000 |
Duration: | 22 weeks |
Client: | The Priory Group |
Completed: | September 2013 |
Project: | Extension to Accommodate Fitness Suite |
Value: | £380,000 |
Duration: | 16 weeks |
Client: | The King’s (Cathedral) School, Peterborough |
Completed: | August 2013 |
Project: | New Hyundai Retail Outlet for Smith Motor Group |
Value: | £560,000 |
Duration: | 32 weeks |
Client: | Smiths Motor Group |
Completed: | August 2013 |
Project: | Rebranding of Oxfam Store, Bury St Edmunds |
Value: | £80,000 |
Duration: | 9 weeks |
Client: | Oxfam Property Services |
Completed: | August 2013 |
Project: | Refurbishment and New Build, International Timber |
Value: | £3,000,000 |
Duration: | 16 weeks |
Client: | International Timber |
Completed: | June 2013 |
Project: | Remodelling of Offices, W M Morrison, Swan Valley |
Value: | £470,000 |
Duration: | 16 weeks |
Client: | W M Morrison |
Completed: | May 2013 |
Project: | Extension to Create Two New Classrooms |
Value: | £151,000 |
Duration: | 14 weeks |
Client: | Barnack CE Primary School |
Completed: | March 2013 |
Project: | Refurbishment of Office Complex |
Value: | £81,500 |
Duration: | 5 weeks |
Client: | UNITE Union |
Completed: | November 2012 |
Project: | Refurbishment of Residential Property |
Value: | £115,000 |
Duration: | 30 weeks |
Client: | Merton College |
Completed: | August 2012 |
Project: | Sheltered Housing Refurbishment and Construction |
Value: | £420,000 |
Duration: | 34 Weeks |
Client: | Oxford Citizens Housing Association |
Completed: | August 2012 |
Project: | Longthorpe Hall Hospice Refurbishment |
Value: | £74,000 |
Duration: | 15 weeks |
Client: | Sue Ryder Care |
Completed: | July 2012 |
Project: | Sheltered Housing Refurbishment & Construction |
Value: | £420,000 |
Duration: | 20 weeks |
Client: | Catalyst Housing Ltd |
Completed: | July 2012 |
Project: | Void Cottage Refurbishment |
Value: | £48,000 |
Duration: | 11 weeks |
Client: | The National Trust |
Completed: | June 2011 |
Project: | Conversion of Old Retort House, Cliveden House |
Value: | £35,000 |
Duration: | 6 weeks |
Client: | The National Trust |
Completed: | May 2011 |
Project: | Charnwood Lodge Care Home Refurbishment |
Value: | £690,000 |
Duration: | 20 Weeks |
Client: | Craegmoor Group |
Completed: | February 2011 |
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.