Project: | Supermarket Refurbishment |
Value: | £2.3 million |
Duration: | 7 weeks |
Client: | Waitrose |
Completed: | October 2023 |
Project: | Espresso – Costa Oswestry |
Value: | £1.2 million |
Duration: | 20 weeks |
Client: | WM Morrisons Supermarkets Limited |
Completed: | October 2023 |
Project: | Supermarket Refurbishment |
Value: | £2.2 million |
Duration: | 8 weeks |
Client: | Waitrose |
Completed: | September 2023 |
Project: | LED Project |
Value: | £580,000 |
Duration: | 6 weeks |
Client: | Amey |
Completed: | September 2023 |
Project: | LED Project |
Value: | £580,000 |
Duration: | 6 weeks |
Client: | BMAT Trust |
Completed: | September 2023 |
Project: | Refurbishment of floors 5 and 8 of Northumberland House, High Holborn |
Value: | £330,000 |
Completed: | March 2023 |
Project: | Morrisons Chelmsford new store |
Value: | £2,000,000 |
Duration: | 15 weeks |
Client: | Morrisons |
Completed: | February 2023 |
Project: | WMS Leighton Buzzard store refresh |
Value: | £500,000 |
Duration: | 4 weeks |
Client: | Morrisons |
Completed: | April 2023 |
Project: | Refrigeration renovation and store update Morrisons Diss |
Value: | £2,600,000 |
Duration: | 27 weeks inc. Christmas break |
Client: | Morrisons |
Completed: | February 2023 |
Project: | External refurbishment of industrial units at The Exchange, Ipswich |
Duration: | 31 weeks |
Client: | Workman LLP |
Completed: | February 2023 |
Project: | Amalgamation of 3 units at The Glades |
Duration: | 14 weeks |
Client: | Alaska UK |
Completed: | March 2023 |
Project: | Internal & external office refurbishment |
Value: | £470,000 |
Duration: | 16 weeks |
Client: | Graham Sibbald & Kenningtons |
Completed: | December 2022 |
Project: | Waitrose Headington internal refurbishment |
Value: | £2,000,000 |
Duration: | 10 weeks |
Client: | Waitrose and Partners |
Completed: | November 2022 |
Project: | Costa Drive Thru Shell build Bromsgrove and Walsall |
Value: | £1,780,000 |
Duration: | 16 weeks per site |
Client: | Morrisons |
Completed: | November 2022 |
Project: | Claremont Parkway Care Home, Kettering, Care Home refurbishment |
Duration: | 25 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | September 2022 |
Project: | Demolition of existing and build of new Little Clacton store |
Value: | £14,500,000 |
Duration: | 52 weeks |
Client: | Morrisons |
Completed: | July 2022 |
Project: | The Cedars, Bourne, Care Home refurbishment |
Duration: | 20 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | May 2022 |
Project: | Flooring replacement at Peterborough Regional Pool |
Value: | £15,000 |
Duration: | 2 weeks |
Client: | Peterborough Limited |
Completed: | February 2022 |
Project: | Nike up size project at the London Designer Outlet |
Value: | £700,000 |
Duration: | 14 weeks |
Client: | Quintain |
Completed: | February 2022 |
Project: | Complete office refurbishment at Mortimer House, Clapham |
Value: | £545,000 |
Duration: | 14 weeks |
Client: | Columbia Threadneedle Investments |
Completed: | January 2022 |
Project: | Office refurbishment, 32 Ludgate Hill, London |
Value: | £120,000 |
Duration: | 10 weeks |
Completed: | November 2021 |
Project: | Cat A office refurbishment, Croxley Park, Watford |
Value: | £240,000 |
Duration: | 12 weeks |
Completed: | June 2021 |
Project: | Waitrose refurbishment Alcester |
Value: | £1,500,000 |
Duration: | 8 weeks |
Client: | Waitrose/ John Lewis Partnership |
Completed: | June 2021 |
Project: | Office refurbishment, 95 Aldwych Street, London |
Value: | £130,000 |
Duration: | 11 weeks |
Client: | Hartnell Taylor Cook |
Completed: | May 2021 |
Project: | Design, build and install of roof conservatory at St Pancras Hospital |
Value: | £65,000 |
Duration: | 6 weeks |
Client: | Camden & Islington NHS Foundation Trust |
Completed: | May 2021 |
Project: | Adidas Upsize at London Designer Outlet |
Value: | £450,000 |
Duration: | 15 weeks |
Client: | Realm Asset Management |
Completed: | March 2021 |
Project: | Phase 2 warehouse refurbishment works at Jewson Ruislip |
Value: | £280,000 |
Duration: | 12 weeks |
Client: | Saint-Gobain Building Distribution |
Completed: | March 2021 |
Project: | Fit out of new private medical facility |
Value: | £1,500,000 |
Duration: | 21 weeks |
Client: | Med24 Limited |
Completed: | January 2021 |
Project: | Covid-19 vaccinations unit, St Leonards Hospital |
Value: | £40,000 |
Duration: | 8 days |
Client: | NHS Property Services Ltd |
Completed: | December 2020 |
Project: | External refurbishment St John Street, Clerkenwell |
Value: | £200,000 |
Duration: | 12 weeks |
Client: | Daniel Watney |
Completed: | December 2020 |
Project: | Refurbishment to create Social Prescribing Hub |
Value: | £135,000 |
Duration: | 5 weeks |
Client: | NHS Property Services Ltd |
Completed: | December 2020 |
Project: | Fresh Look upgrade Retford store |
Value: | £2,800,000 |
Duration: | 18 weeks |
Client: | Morrisons |
Completed: | November 2020 |
Project: | Public realm enhancement project - Notting Dale Village Campus |
Value: | £1,200,000 |
Duration: | 20 weeks |
Client: | Gerald Eve LLP |
Completed: | November 2020 |
Project: | Façade refurbishment on Oxford Street, London |
Value: | £60,000 |
Duration: | 5 weeks |
Client: | Workman LLP |
Completed: | October 2020 |
Project: | Flooring replacement following flood damage |
Value: | £40,000 |
Duration: | 3 weeks |
Client: | Peterborough United Football Club |
Completed: | October 2020 |
Project: | Office extension and refurbishment |
Value: | £111,000 |
Duration: | 13 weeks |
Client: | Colas UK |
Completed: | October 2020 |
Project: | Former Waitrose store conversion, Oadby |
Value: | £1,600,000 |
Duration: | 18 weeks |
Client: | Lidl UK |
Completed: | September 2020 |
Project: | Fire damage repairs toThe Progression Centre, Hemel Hempstead |
Value: | £1,100,000 |
Duration: | 31 weeks |
Client: | Workman LLP |
Completed: | September 2020 |
Project: | Insurance repairs and remedial works, Thurleigh |
Value: | £65,000 |
Duration: | 10 weeks |
Completed: | September 2020 |
Project: | Phase 2, entrance improvement project at Grand Central Train Station Birmingham |
Client: | Workman LLP |
Completed: | September 2020 |
Project: | Replacement tenant and advertising signage, Grafton Centre, Cambridge |
Client: | Bidwells |
Completed: | September 2020 |
Project: | Former Co-op store conversion, Glenfield |
Value: | £4,100,000 |
Duration: | 22 weeks |
Client: | Morrisons |
Completed: | August 2020 |
Project: | New store, Southend-on-Sea |
Value: | £900,000 |
Duration: | 13 weeks |
Client: | Lidl UK |
Completed: | August 2020 |
Project: | Cafe refurbishment - Retford |
Client: | Morrisons |
Completed: | August 2020 |
Project: | Office refurbishment following flood damage |
Duration: | 12 weeks |
Client: | Unite the Union |
Completed: | August 2020 |
Project: | Covid-19 workplace protection screens |
Duration: | 1 day |
Client: | Buckles Solicitors LLP |
Completed: | July 2020 |
Project: | Conversion of former Co-op store in Stirchley |
Client: | Morrisons |
Completed: | July 2020 |
Project: | Construction of new warehouse and refurbishment to existing building at Jewson Ruislip |
Value: | £870,000 |
Duration: | 20 weeks |
Client: | Saint-Gobain Building Distribution |
Completed: | July 2020 |
Project: | Refurbishment of industrial unit, Hornsey |
Value: | £260,000 |
Duration: | 10 weeks |
Client: | Workman LLP |
Completed: | June 2020 |
Project: | Category A office refurbishment, London |
Value: | £120,000 |
Duration: | 12 week |
Client: | Zurich Assurance Ltd |
Completed: | June 2020 |
Project: | Covid-19 workplace protection screens |
Client: | NHS Property Services Ltd |
Completed: | May 2020 |
Project: | Morrisons Bradwell - Store conversion |
Duration: | 7 weeks |
Client: | Morrisons |
Completed: | April 2020 |
Project: | Morrisons Worksop - Freshlook launch |
Duration: | 8 weeks |
Client: | Morrisons |
Completed: | March 2020 |
Project: | St Pancras Hospital refurbishment |
Value: | £40,000 |
Duration: | 3 weeks |
Client: | Camden and Islington NHS Trust |
Completed: | March 2020 |
Project: | Office refurbishment |
Value: | £150,000 |
Duration: | 6 weeks |
Client: | Vaages Surveying/Dencora |
Completed: | January 2020 |
Project: | London Designer Outlet – Wagamamas Extension |
Value: | £500,000 |
Duration: | 11 weeks |
Client: | Realm |
Completed: | December 2019 |
Project: | White box works to eight retail units |
Value: | £650,000 |
Duration: | 12 weeks |
Client: | The Grafton |
Completed: | October 2019 |
Project: | New Street Mall Refurbishment – Grand Central Station |
Value: | £960,000 |
Duration: | 14 weeks |
Client: | Workman LLP |
Completed: | October 2019 |
Project: | New store creation in Canning Town |
Value: | £3,500,000 |
Duration: | 18.5 weeks |
Client: | Morrisons |
Completed: | October 2019 |
Project: | Phase 5 sprinkler upgrades at centre:mk - Eagle & Field Walk |
Value: | £3,180,000 |
Duration: | 48 weeks |
Client: | Hermes CMK General Partner Ltd |
Completed: | September 2019 |
Project: | Hickathrift House Care Home refurbishment |
Value: | £300,000 |
Duration: | 15 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | September 2019 |
Project: | Fresh Look upgrade and reconfiguration at Letchworth store |
Value: | £2,500,000 |
Duration: | 19 weeks |
Client: | Morrisons |
Completed: | September 2019 |
Project: | Refurbishment of Rushden store |
Value: | £700,000 |
Duration: | 10 weeks |
Client: | Lidl UK |
Completed: | August 2019 |
Project: | Wood Grange Care Home refurbishment |
Value: | £280,000 |
Duration: | 14 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | August 2019 |
Project: | Refurbishment of Masters Court office complex |
Value: | £600,000 |
Duration: | 13 weeks |
Client: | Vaages Surveying |
Completed: | July 2019 |
Project: | Fit out of 4 storey office block, Hainault |
Value: | £525,000 |
Duration: | 14 weeks |
Client: | Keningtons LLP |
Completed: | July 2019 |
Project: | Longueville Court Care Home refurbishment |
Value: | £430,000 |
Duration: | 17 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | May 2019 |
Project: | Internal and external refurbishment of production unit |
Value: | £325,000 |
Duration: | 8 weeks |
Client: | Tuffin Ferraby Taylor LLP |
Completed: | April 2019 |
Project: | WMS Hoddesdon Fresh Look |
Value: | £1,100,000 |
Duration: | 6 weeks |
Client: | Morrisons |
Completed: | April 2019 |
Project: | Conversion works at Daleham Gardens Health Centre |
Value: | £270,000 |
Duration: | 11 weeks |
Client: | Camden and Islington NHS trust |
Completed: | March 2019 |
Project: | Retail unit conversion at intu Uxbridge |
Value: | £2,800,000 |
Duration: | 36 weeks |
Client: | intu |
Completed: | January 2019 |
Project: | Rose Lodge Care Home refurbishment |
Value: | £250,000 |
Duration: | 14 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | January 2019 |
Project: | Extension and refurbishment of Pitsea store |
Value: | £1,400,000 |
Duration: | 18 weeks |
Client: | Lidl UK |
Completed: | November 2018 |
Project: | Fresh Look upgrade to Wood Green store |
Value: | £3,750,000 |
Duration: | 20 weeks |
Client: | Morrisons |
Completed: | November 2018 |
Project: | Construction of aviaries at East Winch Wildlife Centre |
Duration: | 14 weeks |
Client: | RSPCA |
Completed: | November 2018 |
Project: | Extension and Fresh Look upgrade to Sidcup store |
Value: | £3,800,000 |
Duration: | 22 weeks |
Client: | Morrisons |
Completed: | November 2018 |
Project: | Morrisons Grantham Fresh Look |
Value: | £1,200,000 |
Duration: | 9 weeks |
Client: | Morrisons |
Completed: | October 2018 |
Project: | Musicians' Union internal and external refurbishment |
Value: | £293,000 |
Duration: | 13 weeks |
Client: | Musicians' Union |
Completed: | October 2018 |
Project: | Refurbishment of Chater Lodge Care Home, Stamford |
Value: | £220,000 |
Duration: | 12 weeks |
Client: | Barchester Healthcare Limited |
Completed: | August 2018 |
Project: | Refurbishment of Industrial Unit, Unit E Chiltern Park |
Value: | £1,440,000 |
Duration: | 20 weeks |
Client: | ML Accessories Ltd |
Completed: | April 2018 |
Project: | Phase 3 sprinkler upgrades at centre:mk |
Value: | £1,200,000 |
Duration: | 20 weeks |
Client: | Hermes Plc |
Completed: | April 2018 |
Project: | Werrington Lodge Care Home refurbishment |
Value: | £240,000 |
Duration: | 12 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | March 2018 |
Project: | Internal and external refurbishment works |
Value: | £330,000 |
Duration: | 8 weeks |
Client: | Greencore Group |
Completed: | March 2018 |
Project: | Creation of two semi-detached bungalows |
Duration: | 6 months |
Client: | King’s Lynn West Norfolk Council |
Completed: | January 2018 |
Project: | Extension and Refurbishment of St Albans Store |
Value: | £3,200,000 |
Duration: | 22 weeks |
Client: | Morrisons |
Completed: | November 2017 |
Project: | Extension and Fresh Look Refurbishment, Welwyn Garden City |
Value: | £2,646,000 |
Duration: | 20 weeks |
Client: | Morrisons |
Completed: | November 2017 |
Project: | Outpatient Department refurbishment at Hammersmith Hospital |
Value: | £1,500,000 |
Duration: | 52 weeks |
Client: | Imperial NHS Trust |
Completed: | November 2017 |
Project: | Home Shopping Pods and Canopies |
Value: | £1,130,000 |
Duration: | 15 weeks |
Client: | Morrisons |
Completed: | November 2017 |
Project: | 95 Aldwych, London, roof replacement and external decoration |
Value: | £230,000 |
Duration: | 16 weeks |
Client: | Hartnell Taylor Cook LLP |
Completed: | October 2017 |
Project: | Strip out of former BHS unit at centre:mk |
Value: | £1,100,000 |
Duration: | 14 weeks |
Client: | Workman LLP |
Completed: | September 2017 |
Project: | Collingtree Park Care Home refurbishment |
Value: | £210,000 |
Duration: | 12 weeks |
Client: | Barchester Healthcare Ltd |
Completed: | August 2017 |
Project: | Warehouse refurbishment to create new CTD Centre, Lincoln |
Value: | £160,000 |
Duration: | 9 weeks |
Client: | Saint Gobain |
Completed: | July 2017 |
Project: | Creation of Pathology Lab, Charing Cross Hospital |
Value: | £170,000 |
Duration: | 5 weeks |
Client: | Imperial College Healthcare NHS Trust |
Completed: | June 2017 |
Project: | Deer Walk Guest Services Lounge centre:mk |
Value: | £5,800,000 |
Duration: | 44 weeks |
Client: | Hermes CMK General Partner Ltd |
Completed: | June 2017 |
Project: | Cassio Metro Leisure Centre, fire damage repairs |
Value: | £830,000 |
Duration: | 36 weeks |
Client: | Arun Associates |
Completed: | May 2017 |
Project: | Communal areas refurbishment, Charles Street London |
Value: | £422,000 |
Duration: | 12 weeks |
Client: | Keningtons LLP |
Completed: | March 2017 |
Project: | Priority Plumbing Refurbishment, New Southgate, London |
Value: | £110,000 |
Duration: | 6 weeks |
Client: | Saint Gobain |
Completed: | February 2017 |
Project: | Extension and improvements to store and petrol filling station, Chingford |
Value: | £4,125,000 |
Duration: | 26 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | January 2017 |
Project: | Strip out and landlord enabling works, Queensgate Shopping Centre |
Value: | £400,000 |
Duration: | 11 weeks |
Client: | Redevco |
Completed: | January 2017 |
Project: | Extension and Alterations to Broomwood Surgery |
Value: | £1,000,000 |
Duration: | 35 weeks |
Client: | Drs Bamberger & Lasrado |
Completed: | December 2016 |
Project: | Sunset Walk refurbishment the centre:mk |
Value: | £7,500,000 |
Duration: | 38 weeks |
Client: | Hermes CMK General Partner Ltd |
Completed: | December 2016 |
Project: | Fresh Look reformat, Morrisons Maldon |
Value: | £400,000 |
Duration: | 4 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | October 2016 |
Project: | Office Refurbishment, Sol House, Northampton |
Value: | £1,000,000 |
Duration: | 16 weeks |
Client: | Workman LLP / Simply Business |
Completed: | October 2016 |
Project: | Fresh Look reformat, Morrisons Cambourne |
Value: | £400,000 |
Duration: | 5 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | September 2016 |
Project: | Farmfield & Thornford Park Anti-Ligature Works |
Value: | £860,000 |
Duration: | Completed over a 3 year period |
Client: | The Priory Group (Priory Healthcare) |
Completed: | September 2016 |
Project: | Fresh Look reformat, Morrisons Eastwood |
Value: | £660,000 |
Duration: | 5 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | September 2016 |
Project: | Internal alterations to convert single dwelling into two dwellings |
Value: | £82,000 |
Duration: | 12 weeks |
Client: | Longhurst and Havelock Homes |
Completed: | September 2016 |
Project: | Structural alterations and landlord enabling works |
Value: | £90,000 |
Duration: | 6 weeks |
Client: | INTU Chapelfield Shopping Centre |
Completed: | September 2016 |
Project: | Temple Lodge external upgrades |
Value: | £130,000 |
Duration: | 12 weeks |
Client: | Abbey Commercial Ltd |
Completed: | September 2016 |
Project: | Conversion of flats into classrooms |
Value: | £42,000 |
Duration: | 5 weeks |
Client: | The Priory Group |
Completed: | September 2016 |
Project: | Extension of Primrose unit oncology ward |
Value: | £440,000 |
Duration: | 16 weeks |
Client: | Bedford Hospital NHS Trust |
Completed: | September 2016 |
Project: | Essential refrigeration works & Fresh Look, Morrisons Northampton |
Value: | £1,300,000 |
Duration: | 10 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | September 2016 |
Project: | Undercroft extension of retail unit at INTU Chapelfield Shopping Centre Norwich for Cafe Nero |
Value: | £150,000 |
Duration: | 16 weeks |
Client: | INTU Properties PLC |
Completed: | August 2016 |
Project: | Development of Manor Field Residential Facility |
Value: | £325,000 |
Duration: | 12 weeks |
Client: | The Priory Group (Craegmoor) |
Completed: | August 2016 |
Project: | Conversion of domestic dwelling to 6 bed care home |
Value: | £215,000 |
Duration: | 12 weeks |
Client: | The Priory Group |
Completed: | August 2016 |
Project: | Critical refrigertaion and Fresh Look, Morrisons Leighton Buzzard |
Value: | £1,100,000 |
Duration: | 12 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | August 2016 |
Project: | Creation of 474 extra parking spaces at Lynchwood Business Park |
Value: | £1,840,000 |
Duration: | 16 weeks |
Client: | SPCP GROUP III LOPD 14 |
Completed: | July 2016 |
Project: | Reinstatement of domestic dwelling after fire damage |
Value: | £65,000 |
Duration: | 20 weeks |
Client: | Quantum Survey Management |
Completed: | July 2016 |
Project: | Fresh Look Store Re-fit Morrisons Felixstowe |
Value: | £400,000 |
Duration: | 4 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | June 2016 |
Project: | Eight Instore Cafe Re-fits |
Value: | £400,000 |
Duration: | 8 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | May 2016 |
Project: | Office Refurbishment Phase 2, Medina House, Milton Keynes |
Value: | £530,000 |
Duration: | 12 weeks |
Client: | Dencora (2000) Ltd |
Completed: | May 2016 |
Project: | Additional security measures at Queensgate Shopping Centre car parks |
Value: | £1,300,000 |
Duration: | 12 months |
Client: | Queensgate Shopping Centre |
Completed: | May 2016 |
Project: | West Oak Care Home Refurbishment |
Value: | £180,000 |
Duration: | 10 weeks |
Client: | Barchester Healthcare |
Completed: | May 2016 |
Project: | Refurbishment of Jim Gillespie House Care Home |
Value: | £180,000 |
Duration: | 14 weeks |
Client: | Abbeyfield Care |
Completed: | May 2016 |
Project: | Reigate Beaumont Care Home Refurbishment |
Value: | £160,000 |
Duration: | 10 weeks |
Client: | Barchester Healthcare |
Completed: | May 2016 |
Project: | Extension & Refurbishment of Care Home |
Value: | £630,000 |
Duration: | 32 weeks |
Client: | Together for Mental Wellbeing |
Completed: | February 2016 |
Project: | New Store Fit-out, Morrisons, Colindale |
Value: | £4,000,000 |
Duration: | 14 weeks |
Client: | Wm Morrison Supermarkets |
Completed: | March 2016 |
Project: | Construction of Chinnor Community Building |
Value: | £1,200,000 |
Duration: | 46 weeks |
Client: | Chinnor Parish Council |
Completed: | February 2016 |
Project: | Conversion of Two Flats to Living Accomodation |
Value: | £160,000 |
Duration: | 12 weeks |
Client: | Danshell |
Completed: | February 2016 |
Project: | Office Refurbishment, Medina House, Milton Keynes |
Value: | £600,000 |
Duration: | 10 weeks |
Client: | Dencora (2000) Limited |
Completed: | February 2016 |
Project: | Refurbishment of Ward 7a, Lister Hospital |
Value: | £270,000 |
Duration: | 8 weeks |
Client: | East & North Herts NHS Trust |
Completed: | December 2015 |
Project: | Major Alterations Work to Live Jewson Store |
Value: | £750,000 |
Duration: | 21 weeks |
Client: | Jewson Saint-Gobain Ltd |
Completed: | October 2015 |
Project: | Reconfiguration & Refurbishment of The Priory Hospital, Heathfield |
Value: | £340,000 |
Duration: | 10 weeks |
Client: | The Priory Group |
Completed: | October 2015 |
Project: | Jack Hunt School, Life Cycle Works |
Value: | £327,000 |
Duration: | 5 weeks |
Client: | Bouygues UK |
Completed: | September 2015 |
Project: | Refurbishment of Agricultural Building |
Value: | £265,000 |
Duration: | 10 weeks |
Client: | East of England Agricultural Society |
Completed: | September 2015 |
Project: | Works in Lieu of Dilapidations at 20–22 Berkeley Square, London |
Value: | £40,000 |
Duration: | 4 weeks |
Client: | Keningtons LLP |
Completed: | September 2015 |
Project: | Smiths Nissan Showroom Refurbishment |
Value: | £200,000 |
Duration: | 12 weeks |
Client: | Smiths Motor Group |
Completed: | September 2015 |
Project: | Replacement of Hardwood Sash Windows |
Value: | £350,000 |
Duration: | 5 weeks |
Client: | Amey |
Completed: | August 2015 |
Project: | Westgate Arcade Refurbishment |
Value: | £410,000 |
Duration: | 12 weeks |
Client: | Queensgate Shopping Centre |
Completed: | July 2015 |
Project: | Refurbishment of Belhaven Care Home |
Value: | £220,000 |
Duration: | 8 weeks |
Client: | The Priory Group |
Completed: | July 2015 |
Project: | Children’s Home Refurbishment, Ipswich |
Value: | £220,000 |
Duration: | 8 weeks |
Client: | Priory Group |
Completed: | July 2015 |
Project: | 900 Pavillion Drive Office Refurbishment |
Value: | £365,000 |
Duration: | 26 weeks |
Client: | Zurich Assurance |
Completed: | June 2015 |
Project: | Internal Alterations and Refurbishment, Western House, Lynchwood |
Value: | £312,000 |
Duration: | 12 weeks |
Client: | Dencora Peterborough LLP |
Completed: | March 2015 |
Project: | Internal Refurbishment of Donington Church Hall |
Value: | £40,000 |
Duration: | 9 weeks |
Client: | Donington Church PCC |
Completed: | March 2015 |
Project: | Venture Park Refurbishment of Offices and Commercial Units |
Value: | £420,000 |
Duration: | 11 weeks |
Client: | Zurich Assurance |
Completed: | March 2015 |
Project: | Refurbishment of The Oaks Care Home |
Value: | £425,000 |
Duration: | 36 weeks |
Client: | The Priory Group (Amore Care) |
Completed: | March 2015 |
Project: | Office Fit out at Unison Centre, Kings Cross |
Value: | £185,000 |
Duration: | 8 weeks |
Client: | Unison |
Completed: | March 2015 |
Project: | Bedford Hospital Endoscopy Refurbishment Phase 2 |
Value: | £400,000 |
Duration: | 8 weeks |
Client: | Bedford Hospital NHS Trust |
Completed: | March 2015 |
Project: | Office Refurbishment, Chelmsford |
Value: | £160,000 |
Duration: | 6 weeks |
Client: | Threadneedle UK Property Trust |
Completed: | February 2015 |
Project: | Extension for Giles Brook School, Milton Keynes |
Value: | £195,000 |
Duration: | 18 weeks |
Client: | Giles Brook School |
Completed: | January 2015 |
Project: | Morrison’s Critical Refrigeration Works, Peckham |
Value: | £1.1 million |
Duration: | 14 weeks |
Client: | WM Morrison Supermarkets PLC |
Completed: | December 2014 |
Project: | Refurbishment of Fire Damaged Industrial Units |
Value: | £825,000 |
Duration: | 24 weeks |
Client: | Belljoy Limited |
Completed: | December 2014 |
Project: | Enstone Parish Hall Internal Fit Out |
Value: | £100,000 |
Duration: | 6 weeks |
Client: | Enstone Parish Council |
Completed: | November 2014 |
Project: | Corporate Identity Refresh to Vauxhall Showroom |
Value: | £154,000 |
Duration: | 15 weeks |
Client: | Smiths Motor Group |
Completed: | October 2014 |
Project: | Faringdon Lodges Refurbishment |
Value: | £350,000 |
Duration: | 42 weeks |
Client: | The National Trust |
Completed: | September 2014 |
Project: | Barratt Industrial Park Refurbishment |
Value: | £345,000 |
Duration: | 20 weeks |
Client: | Workman LLP |
Completed: | May 2014 |
Project: | Duchess of Kent Hospice Refurbishment |
Value: | £950,000 |
Duration: | 26 Weeks |
Client: | Sue Ryder |
Completed: | May 2014 |
Project: | Bedford Hospital Dementia Wards Refurbishment |
Value: | £500,000 |
Duration: | 26 Weeks |
Client: | Bedford Hospital NHS Trust |
Completed: | February 2014 |
Project: | Newlands Shopping Centre Lighting & Ceiling Refit |
Value: | £400,000 |
Duration: | 16 weeks |
Client: | Ellandi |
Completed: | November 2013 |
Project: | Refurbishment of Museum and Gallery |
Value: | £140,000 |
Duration: | 12 weeks |
Client: | Peterborough City Council |
Completed: | November 2013 |
Project: | Industrial Unit Refurbishment, Leamington Spa |
Value: | £375,000 |
Duration: | 12 weeks |
Client: | Transco |
Completed: | October 2013 |
Project: | Refurbishment and Anti-Ligature Works, Chadwick Lodge |
Value: | £358,000 |
Duration: | 22 weeks |
Client: | The Priory Group |
Completed: | September 2013 |
Project: | Extension to Accommodate Fitness Suite |
Value: | £380,000 |
Duration: | 16 weeks |
Client: | The King’s (Cathedral) School, Peterborough |
Completed: | August 2013 |
Project: | New Hyundai Retail Outlet for Smith Motor Group |
Value: | £560,000 |
Duration: | 32 weeks |
Client: | Smiths Motor Group |
Completed: | August 2013 |
Project: | Rebranding of Oxfam Store, Bury St Edmunds |
Value: | £80,000 |
Duration: | 9 weeks |
Client: | Oxfam Property Services |
Completed: | August 2013 |
Project: | Refurbishment and New Build, International Timber |
Value: | £3,000,000 |
Duration: | 16 weeks |
Client: | International Timber |
Completed: | June 2013 |
Project: | Remodelling of Offices, W M Morrison, Swan Valley |
Value: | £470,000 |
Duration: | 16 weeks |
Client: | W M Morrison |
Completed: | May 2013 |
Project: | Extension to Create Two New Classrooms |
Value: | £151,000 |
Duration: | 14 weeks |
Client: | Barnack CE Primary School |
Completed: | March 2013 |
Project: | Refurbishment of Office Complex |
Value: | £81,500 |
Duration: | 5 weeks |
Client: | UNITE Union |
Completed: | November 2012 |
Project: | Refurbishment of Residential Property |
Value: | £115,000 |
Duration: | 30 weeks |
Client: | Merton College |
Completed: | August 2012 |
Project: | Sheltered Housing Refurbishment and Construction |
Value: | £420,000 |
Duration: | 34 Weeks |
Client: | Oxford Citizens Housing Association |
Completed: | August 2012 |
Project: | Longthorpe Hall Hospice Refurbishment |
Value: | £74,000 |
Duration: | 15 weeks |
Client: | Sue Ryder Care |
Completed: | July 2012 |
Project: | Sheltered Housing Refurbishment & Construction |
Value: | £420,000 |
Duration: | 20 weeks |
Client: | Catalyst Housing Ltd |
Completed: | July 2012 |
Project: | Void Cottage Refurbishment |
Value: | £48,000 |
Duration: | 11 weeks |
Client: | The National Trust |
Completed: | June 2011 |
Project: | Conversion of Old Retort House, Cliveden House |
Value: | £35,000 |
Duration: | 6 weeks |
Client: | The National Trust |
Completed: | May 2011 |
Project: | Charnwood Lodge Care Home Refurbishment |
Value: | £690,000 |
Duration: | 20 Weeks |
Client: | Craegmoor Group |
Completed: | February 2011 |